Exam 12: Project Communication and Documentation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Allow time for interaction with the audience, if appropriate.

(True/False)
4.8/5
(31)

Often the project manager or members of the project team are called on to give a formal presentation.The first step is to

(Multiple Choice)
4.7/5
(28)

List some common barriers to effective listening:

(Essay)
4.7/5
(28)

All of the following are suggestions for improving listening skills except

(Multiple Choice)
4.8/5
(33)

After a meeting, the meeting results should typically be published within ____.

(Multiple Choice)
4.8/5
(41)

The two most common types of project reports are the:

(Multiple Choice)
4.8/5
(40)

Request the audiovisual equipment well in advance.

(True/False)
4.8/5
(34)

Teleconferencing includes tools such as conference calls and videoconferencing.

(True/False)
4.9/5
(35)

When communicating with individuals from other cultures or countries, their customs regarding greetings, gestures, eye contact, and protocol are not important.

(True/False)
4.9/5
(31)

Lengthy dissertations or voluminous extraneous attachments may be perception of being flooded with emails or electronic messages and be more of a hindrance than a help.

(True/False)
4.7/5
(33)

Verbal correspondence is normally transmitted through e-mail or can be sent hardcopy.

(True/False)
4.8/5
(37)

Speak clearly and confidently.

(True/False)
4.8/5
(33)

Emoticons are considered professional, and all recipients will understand the abbreviations.

(True/False)
4.9/5
(37)

The project manager should summarize the meeting results at the end of the meeting.

(True/False)
4.9/5
(31)

Throughout a project, various project documents will be revised to incorporate changes.

(True/False)
4.9/5
(37)

When making key points, explain to the audience why they are important.

(True/False)
4.8/5
(39)

The final report might include the following except

(Multiple Choice)
4.8/5
(30)

During the meeting, the project manager should

(Multiple Choice)
4.8/5
(28)

At the start of the meeting, review the purpose of the meeting and the agenda.

(True/False)
4.7/5
(33)

The ____ needs to be updated as stakeholders or their information needs change, or if new people or new documents are identified.

(Multiple Choice)
4.8/5
(32)
Showing 61 - 80 of 164
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)