Exam 12: Project Management

arrow
  • Select Tags
search iconSearch Question
  • Select Tags

Which of the following is not a project resource?

Free
(Multiple Choice)
4.8/5
(35)
Correct Answer:
Verified

B

What is the popular concept of unknown origin that assumes that if anything can go wrong,it will,and at the most inopportune time?

Free
(Short Answer)
4.8/5
(39)
Correct Answer:
Verified

Murphy's Law

For an external project,what does meet and or exceeding expectations frequently generate?

Free
(Short Answer)
4.8/5
(38)
Correct Answer:
Verified

additional business

Which of these is not true of the final report for a project?

(Multiple Choice)
4.9/5
(23)

A project designed to improve work processes within a department would be appropriate for a cross-functional team.

(True/False)
4.7/5
(33)

Name the two ways in which authority for a project typically comes about.

(Short Answer)
4.7/5
(42)

Microsoft OneNote software is an example of a ________ that may be used to manage small projects.

(Short Answer)
4.7/5
(32)

For some projects,technical expertise and cognitive ability may be critical ________ factors that are required.

(Short Answer)
4.9/5
(32)

The team ________ is generally appointed and must possess strong leadership and communication skills as well as the technical expertise required for the project.

(Short Answer)
4.8/5
(30)

At the conclusion of an external project,these are presented to the client for final approval.

(Multiple Choice)
4.9/5
(38)

A general rule of thumb is that a large team working on a collaborative project is more challenging to manage than a small team working on the same project.

(True/False)
4.8/5
(44)

After assessing the risks of a project,the second step is to ________ each risk,or to think about whether the adverse impact will be major or minor.

(Short Answer)
4.7/5
(39)

Match each term with its definition -The possibility of loss,damage,or adverse results

(Multiple Choice)
4.9/5
(36)

For internal projects,normally a formal or written document defining the scope of the project and the deliverables is prepared,agreed upon,and signed by top management.

(True/False)
4.9/5
(32)

In preparing a project ________ plan,team members break down the key components to include all the tasks that have to be performed,the timing and sequence of the tasks,and a confirmation that resources are available to complete the project.

(Short Answer)
4.9/5
(37)

Which of these does not represent an industry in which workers spend most of their time working on projects?

(Multiple Choice)
4.9/5
(28)

Match each term with its definition -A team that represents different departments of the organization

(Multiple Choice)
4.9/5
(39)

What document is typically prepared at the end of a project?

(Short Answer)
4.7/5
(40)

Match each term with its definition -A defined set of tasks with specific outcomes that form a unit of work to be completed in a specified timeframe with specified resources

(Multiple Choice)
4.7/5
(38)

The initial plan for the project can be thought of as its strategic plan.

(True/False)
4.9/5
(30)
Showing 1 - 20 of 30