Exam 7: Lean Systems
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
Which of the following is generally not accepted as a JIT action,when a manufacturer took the following actions to reduce inventory?
(Multiple Choice)
4.8/5
(37)
When a push system is replaced by a pull system,with smaller lot sizes,many benefits can be realized.Which one of the following statements correctly represents one of these benefits?
(Multiple Choice)
4.8/5
(34)
One goal of JIT partnerships is the elimination of in-plant inventory,in the form of raw materials,parts,or components; failure to meet this goal is a sign that suppliers are undependable.
(True/False)
4.8/5
(46)
A company uses a kanban system.The daily demand for part A is 100 units.The average waiting time for a container of parts is 0.2 day.The processing time for a container of part A is 0.1 day,and a container holds 5 units.If the company wishes to use a 10% policy variable,how many containers are needed?
(Essay)
4.8/5
(31)
The goal of single-digit setup is to have a setup completed in less than 10 hours.
(True/False)
4.8/5
(31)
Table 7.2
A manufacturer using a kanban system has had problems with high inventory levels of one of the component parts it makes. Daily demand for the part is 3000 units, average waiting time during production is 0.20 day, processing time is 0.10 day per container, and a container holds 150 pieces.
-Use the information in Table 7.2.How many kanban containers would be required if a 10 % efficiency factor is used?
(Multiple Choice)
4.7/5
(44)
One benefit of a just-in-time system is that it reduces lead time.
(True/False)
4.9/5
(38)
What is variability in the context of JIT systems? What characteristics of lean systems aid in reduction of process variability?
(Essay)
4.9/5
(36)
One method that JIT systems use to implement the process of continuous improvement is to remove kanban cards from the system.
(True/False)
4.9/5
(41)
Which of the following is not an example of the pull method of material flows?
(Multiple Choice)
4.8/5
(41)
Mixed-model assembly is a type of assembly that produces a mix of models in smaller lots.
(True/False)
4.8/5
(34)
Which of the following is not an element of JIT practices?
(Multiple Choice)
4.9/5
(34)
A value stream map shows the flows of materials and information and the lines of responsibility and authority.
(True/False)
4.8/5
(29)
The rewards system normally needs to be revamped when a just-in-time (JIT)system is implemented.
(True/False)
4.8/5
(35)
________ is a system where the supplier is brought into the plant to be an active member of the purchasing office of the customer.
(Short Answer)
4.8/5
(44)
Showing 121 - 140 of 158
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)