Exam 7: Lean Systems
Exam 1: Creating Customer Value through Operations128 Questions
Exam 2: Supply Chain Management171 Questions
Exam 3: Process Configuration137 Questions
Exam 4: Capacity145 Questions
Exam 5: Inventory Management177 Questions
Exam 6: Quality and Process Improvement240 Questions
Exam 7: Lean Systems158 Questions
Exam 8: Managing Projects153 Questions
Exam 9: Location and Layout217 Questions
Exam 10: Managing Demand and Forecasting189 Questions
Exam 11: Operations Planning and Scheduling138 Questions
Exam 12: Resource Planning174 Questions
Exam 13: Decision Making82 Questions
Exam 14: Financial Analysis41 Questions
Exam 15: Work Measurement98 Questions
Exam 16: Learning Curve Analysis44 Questions
Exam 17: Computer-Integrated Manufacturing53 Questions
Exam 18: Acceptance Sampling Plans71 Questions
Exam 19: Simulation36 Questions
Exam 20: Special Inventory Models33 Questions
Exam 21: Linear Programming57 Questions
Exam 22: Waiting Lines109 Questions
Select questions type
Hidden problems are generally uncovered during the process of reducing inventory.
(True/False)
4.9/5
(25)
Which one of the following is not a benefit of the implementation of JIT?
(Multiple Choice)
4.8/5
(42)
If any employee senses that the process is producing defects or is about to go out of proper specification, He or she has the responsibility to stop the process.This is called jidoka.
(True/False)
4.8/5
(41)
Which of the following statements regarding a pull system is true?
(Multiple Choice)
4.9/5
(35)
Table 7.1
A toy company uses a kanban system to make a metal fastener that is a component of several toys. The waiting time for a container of the fasteners during production is 0.25 day; average processing time is 0.15 day per container. Each container holds 200 fasteners. The company uses 2000 fasteners a day in the production of its product.
-Use the information in Table 7.1.Using an efficiency factor of 5 %,calculate the number of kanban containers needed for the fastener.
(Multiple Choice)
4.7/5
(31)
Suppliers often cite which of the following as a major concern?
(Multiple Choice)
4.9/5
(31)
The quality management tool called poka-yoke is not relevant to JIT systems.
(True/False)
4.9/5
(34)
Which one of the following is not a characteristic of JIT systems?
(Multiple Choice)
4.7/5
(36)
What are the characteristics of just-in-time partnerships with respect to quantities?
(Essay)
4.9/5
(39)
Just-in-time systems do not need stable master production schedules.
(True/False)
4.8/5
(40)
A(n)________ is a JIT concept that results in material being produced only when requested and moved to where it is needed just and only as it is needed.
(Short Answer)
4.9/5
(45)
A(n)________ is a card used to control the flow of production through a factory.
(Short Answer)
4.9/5
(27)
________ is the philosophy that waste can be eliminated by cutting unnecessary inventory and removing non-value-adding activities in operations.
(Short Answer)
4.8/5
(25)
The standardization of components,called part commonality or ________,increases repeatability which supports lean production.
(Short Answer)
5.0/5
(32)
Which one of the following is not one of the characteristics of JIT systems?
(Multiple Choice)
4.8/5
(34)
Which of the following will result if the goals of JIT partnerships are met?
(Multiple Choice)
4.9/5
(34)
Explain how a line flow strategy can be used to reduce or eliminate setups.
(Essay)
4.9/5
(41)
The ________ method produces the item in advance of customer need.
(Short Answer)
4.8/5
(39)