Exam 11: Statistically Based Quality Improvement for Variables
Exam 1: Differing Perspectives on Quality111 Questions
Exam 2: Quality Theory101 Questions
Exam 3: Global Supply Chain Quality and International Quality Standards103 Questions
Exam 4: Strategic Quality Planning104 Questions
Exam 5: The Voice of the Customer100 Questions
Exam 6: The Voice of the Market102 Questions
Exam 7: Quality and Innovation in Product and Process Design101 Questions
Exam 8: Designing Quality Services104 Questions
Exam 9: Managing Supplier Quality in the Supply Chain77 Questions
Exam 10: The Tools of Quality98 Questions
Exam 11: Statistically Based Quality Improvement for Variables99 Questions
Exam 12: Statistically Based Quality Improvement for Attributes100 Questions
Exam 13: Six Sigma Management and Lean Tools101 Questions
Exam 14: Managing Quality Improvement Teams and Projects101 Questions
Exam 15: Implementing and Validating the Quality System96 Questions
Select questions type
In a variables control chart, which of the following has occurred if seven points, either increasing or decreasing, are in succession?
(Multiple Choice)
4.8/5
(25)
Which of the following provides a documented, proactive approach to defining how to respond when process control charts show a process is out of control?
(Multiple Choice)
4.8/5
(34)
Consumer's risk happens when statistical quality analysis fails to result in the scrapping or reworking of a defective product.
(True/False)
4.8/5
(35)
Explain why random samples are difficult to achieve in a production environment.
(Essay)
5.0/5
(43)
Processes that achieve capability indexes of 1.25 are world-class capable.
(True/False)
4.7/5
(38)
If a sample is systematic according to time, the product is inspected at regular intervals of time.
(True/False)
4.8/5
(35)
An attribute is a continuous measurement such as weight, height, or volume.
(True/False)
4.9/5
(39)
In the study of quality, Type I error is called consumer's risk.
(True/False)
4.8/5
(30)
Which of the following is not one of the alternative names for one hundred percent samples?
(Multiple Choice)
4.7/5
(28)
Provide two examples of process chart data point interpretations that are not necessarily "out of control" but would still merit further investigation and have potential for corrective actions.
(Essay)
4.8/5
(28)
In a variables control chart, which of the following has occurred if five points are in succession, either all above or below the center line?
(Multiple Choice)
4.8/5
(31)
What is the first step in developing process control charts?
(Multiple Choice)
4.9/5
(36)
The upper and lower specifications for metal head plates are 5 ±0.1 cm. A sample of the metal head plates in 25 undergraduates yields a mean of 5.05. What is the population standard deviation if the population capability index is 1.666?
(Multiple Choice)
4.9/5
(34)
Showing 81 - 99 of 99
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)