Exam 8: Measuring and Controlling Quality

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

After consolidating the types of errors into five categories,a ________was performed.?

(Multiple Choice)
4.8/5
(32)

Define each of the following control chart patterns.Include a sketch of each pattern with your definition. a.One point outside the control limits b.Sudden shift in the process average c.Cycles d.Trends e.Hugging the center line f.Hugging the control limits

(Essay)
4.9/5
(32)

A c-chart is based on the binomial distribution.

(True/False)
4.9/5
(37)

What did the statistical consultants recommend to the managers of the pharmaceutical company,after the maintenance technician explained the reason for the increased length of the syringes? Was it implemented? What was the final result?

(Essay)
4.8/5
(39)

The sample size for an x-chart:

(Multiple Choice)
4.9/5
(36)

Which of the following charts is used to monitor the average number of nonconformances per unit when sample sizes vary?

(Multiple Choice)
4.7/5
(41)

c-charts are based on the _____ probability distribution.

(Multiple Choice)
4.8/5
(27)

Which of the following pairs of charts are used together?

(Multiple Choice)
4.9/5
(36)

Process capability calculations make little sense if the process:

(Multiple Choice)
4.8/5
(34)

_____ is measured as the amount of error in a measurement in proportion to the total size of the measurement.

(Multiple Choice)
4.8/5
(40)

Define the term statistical process control.Outline the steps for setting up a control chart to monitor a process.

(Essay)
5.0/5
(38)

Compared to variable measurement,attributes measurement requires _____ to obtain the same amount of statistical information about the quality of the product.

(Multiple Choice)
4.9/5
(35)

Control limits are often confused with _____.

(Multiple Choice)
4.8/5
(41)

If the process mean and variance do not change over time,the process is considered to be:

(Multiple Choice)
4.8/5
(33)

A p-chart is used with the attribute data.

(True/False)
4.9/5
(30)

If the lower limit for a p-chart computes to a number less than zero,this indicates:

(Multiple Choice)
4.8/5
(38)

What were the conclusions drawn by the statistical consultants using the R-chart?

(Essay)
4.9/5
(31)

State the conclusion drawn by the operators in the capability study of the tacking operation.

(Essay)
4.9/5
(37)

Identify the tradeoffs associated with the s-chart instead of the R-chart.

(Essay)
4.9/5
(38)

_____ is a study of variation in a measurement system using statistical analysis.

(Multiple Choice)
5.0/5
(27)
Showing 41 - 60 of 105
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)