Two jobs (J1 and J2) are to be scheduled on a single workcenter. J1 has a process time of 5 and J2 has a process time of 3. J1 has a due date of time 6 and J2 has a due date of time 7. If the jobs are scheduled by the SPT rule, in what order will they be processed?

(Multiple Choice)
4.9/5
(33)

Vehicle routing problems typically involve only a single objective.

(True/False)
4.9/5
(44)

Briefly describe the relative advantages and disadvantages of the various dispatching rules listed in the textbook. Why might a firm wish to choose one rule over another?

(Essay)
4.9/5
(40)

Planning production that takes into account the demand for several product models is referred to as?

(Multiple Choice)
4.9/5
(34)

If I is the input rate and O is the output rate, what happens when I > O?

(Multiple Choice)
4.8/5
(37)

If I is the input rate and O is the output rate, what happens when I = O?

(Multiple Choice)
4.8/5
(31)

All of the following may lead to delays except?

(Multiple Choice)
4.7/5
(30)

Short production runs have what effect on the number of machine setups?

(Multiple Choice)
4.7/5
(26)

Heuristic approaches to vehicle routing problems are guaranteed to find the best (optimal) routes.

(True/False)
4.8/5
(38)

Which job shop dispatch rule schedules the job with the earliest due date first?

(Multiple Choice)
4.7/5
(43)

In a flow management context, customer orders are referred to as?

(Multiple Choice)
4.8/5
(40)

In a job shop, ________ are used to identify incoming materials and purchases that may be behind schedule.

(Short Answer)
4.9/5
(47)

In a vehicle routing problem _________ represent origin/destination points and pickup and/or delivery points.

(Short Answer)
4.8/5
(38)

It is often advantageous for a firm to be able to build multiple models on the same assembly line.

(True/False)
4.8/5
(30)

The average amount of time a job finishes past the due date is?

(Multiple Choice)
4.8/5
(34)

Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J1?

(Multiple Choice)
4.9/5
(30)

There are rarely scheduling issues in an assembly line.

(True/False)
4.8/5
(34)

Two jobs (J1 and J2) are scheduled on two workcenters (WCA and WCB). J1 starts at time 0 on WCA and finishes on that workcenter at time 5. J2 starts at time 0 on WCB and finishes at time 3. J2 then starts on WCA at time 5 and finishes at time 9. J1 has a due date of time 6 and J2 has a due date of time 7. What is the tardiness of J2?

(Multiple Choice)
4.9/5
(32)

Completing more jobs per period can be achieved by?

(Multiple Choice)
4.7/5
(30)

If WIP levels are reasonable and product flow is steady, then the input rate for a job shop should be?

(Multiple Choice)
5.0/5
(37)