Exam 10: Quality Management and Six Sigma
Exam 1: Operations and Supply Chain Management84 Questions
Exam 2: Strategy and Sustainability54 Questions
Exam 3: Forecasting101 Questions
Exam 4: Strategic Capacity Management64 Questions
Exam 5: Projects77 Questions
Exam 6: Manufacturing and Service Processes73 Questions
Exam 7: Service Processes85 Questions
Exam 8: Sales and Operations Planning65 Questions
Exam 9: Material Requirements Planning89 Questions
Exam 10: Quality Management and Six Sigma149 Questions
Exam 11: Inventory Management108 Questions
Exam 12: Lean Supply Chains73 Questions
Exam 13: Global Sourcing and Procurement78 Questions
Exam 14: Location, Logistics, and Distribution61 Questions
Select questions type
An opportunity flow diagram is a time sequenced chart showing plotted values measuring the flow of end product or components.
Free
(True/False)
4.8/5
(38)
Correct Answer:
False
Which of the following is an analytical tool used in six-sigma quality improvement programs?
Free
(Multiple Choice)
4.7/5
(43)
Correct Answer:
B
With which of the following should we use an "X-bar" chart based on sample means to monitor process quality?
Free
(Multiple Choice)
4.8/5
(39)
Correct Answer:
B
The term CTQ is used in the "Define (D)" portion of the DMAIC methodology.
(True/False)
4.7/5
(42)
A flow chart as part of a six-sigma quality improvement process might be found in which DMAIC category?
(Multiple Choice)
4.8/5
(38)
LTPD in acceptance sampling stands for "lot tolerance for parts defective."
(True/False)
4.9/5
(34)
AQL stands for accepting questionable lots in production quality management.
(True/False)
4.8/5
(45)
The term "conformance quality" refers to the relative level of performance of a product as compared to competing products.For instance,certain luxury sedans are said to be of "higher quality" than some low-priced sub-compact automobiles.
(True/False)
4.9/5
(47)
You want to determine the upper control line for a "p" chart for quality control purposes.You take several samples of a size of 100 items in your production process.From the samples you determine the fraction defective is 0.05 and the standard deviation is 0.01.If the desired confidence level is 99.7 percent,which of the following is the resulting UCL value for the line?
(Multiple Choice)
4.8/5
(42)
Fundamental to any quality program is the determination of quality specifications and the costs of achieving (or not achieving)those specifications.
(True/False)
4.8/5
(28)
Which of the following are eligible companies to be considered for the Baldrige award?
(Multiple Choice)
4.9/5
(26)
The International Organization for Standardization (ISO)is a specialized international agency recognized by affiliates in more than 160 countries.
(True/False)
4.9/5
(39)
While small business organizations can seek to achieve the Baldrige National Quality Award,hospitals cannot.
(True/False)
4.9/5
(33)
The capability index (Cpk)calculates the percentage of items being produced within specifications.
(True/False)
4.7/5
(36)
The producer's risk associated with rejecting a high quality lot is denoted in acceptance sampling with the Greek letter beta.
(True/False)
4.8/5
(30)
The dimension of design quality that concerns secondary characteristics is which of the following?
(Multiple Choice)
4.7/5
(40)
You are developing an "X-bar" chart based on sample means.You know the standard deviation of the sample means is 4,the desired confidence level is 99 percent,and the average of the sample means is 20.What is your LCL? _________________________________________
(Short Answer)
4.9/5
(33)
Philip Crosby states that the correct cost for a well-run quality management program should be under 2.5 percent of sales.
(True/False)
4.8/5
(41)
You want to develop a three-sigma "R" chart.You know the average range is 12 based on several samples of size 6.Which of the following is the resulting LCL?
(Multiple Choice)
4.9/5
(39)
It is impossible to have zero variability in production processes.
(True/False)
4.7/5
(40)
Showing 1 - 20 of 149
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)