Exam 21: Master Scheduling and Material Requirements Planning
Exam 1: Introduction to Managing Global Operations and Supply Chains97 Questions
Exam 2: Operations and Supply Chain Strategies99 Questions
Exam 3: Project Management100 Questions
Exam 4: Supplement: Project Management100 Questions
Exam 5: Product and Service Innovations100 Questions
Exam 6: Supplement: Reliability98 Questions
Exam 7: Managing for Quality100 Questions
Exam 8: Quality Improvement and Control Tools100 Questions
Exam 9: Capacity Planning100 Questions
Exam 10: Supply Chain Design and Location Planning100 Questions
Exam 11: Process Design and Layout Planning100 Questions
Exam 12: Supplement: Tools for Analyzing, Designing, and Selecting Processes and Layouts99 Questions
Exam 13: Supplier Management100 Questions
Exam 14: Logistics Management100 Questions
Exam 15: Demand Management and Customer Service100 Questions
Exam 16: Demand Forecasting Methods100 Questions
Exam 17: Lean Operations and Supply Chains99 Questions
Exam 18: Inventory Management100 Questions
Exam 19: Inventory Control Models100 Questions
Exam 20: Sales and Operations Planning99 Questions
Exam 21: Master Scheduling and Material Requirements Planning100 Questions
Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP100 Questions
Exam 23: Detailed Scheduling100 Questions
Exam 24: Linear Programming100 Questions
Exam 25: The Transportation Models100 Questions
Exam 26: Waiting Line Models100 Questions
Exam 27: Simulation100 Questions
Exam 28: Learning Curves99 Questions
Exam 29: Decision-Making Tools100 Questions
Select questions type
Which of the following reports can be used to track problems and evaluate MRP system performance?
(Multiple Choice)
4.8/5
(27)
A continuous production process is most likely linked to which manufacturing environment?
(Multiple Choice)
4.8/5
(37)
Which system calculates materials,subassemblies,and components required for end item production?
(Multiple Choice)
4.8/5
(39)
The sales and operations plan designs products at what level?
(Multiple Choice)
4.8/5
(42)
Changes to the master schedule during the frozen time fence may be requested only by the ______.
(Multiple Choice)
4.8/5
(31)
The furthest time bucket from the current period lies in which time fence?
(Multiple Choice)
4.7/5
(36)
The process of breaking down product family requirements into individual end items is called ______.
(Multiple Choice)
4.9/5
(37)
The process of making raw materials,components,parts,or subassemblies available only when they're actually required is called ______.
(Multiple Choice)
4.9/5
(36)
With regard to time buckets,the difference between an integrated MRP-JIT system and an only-MRP system is that ______.
(Multiple Choice)
4.8/5
(29)
What is the process of breaking down an end item into the components and materials required called?
(Multiple Choice)
4.8/5
(38)
Filling customer orders received in the frozen time fence may require various considerations.Which of the following is NOT such a consideration?
(Multiple Choice)
4.7/5
(30)
To meet short-run demand and to facilitate production,aggregate units established by sales and operations planning are ______.
(Multiple Choice)
4.7/5
(31)
Which of these is used in JIT and integrated MRP-JIT systems?
(Multiple Choice)
4.7/5
(30)
MRP principles applied in the services industry can be called ______.
(Multiple Choice)
4.8/5
(33)
Showing 21 - 40 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)