A planned order release is a ______ of the MRP process.

(Multiple Choice)
4.8/5
(23)

Which of the following reports can be used to track problems and evaluate MRP system performance?

(Multiple Choice)
4.8/5
(27)

MRP outputs reports are available to ______.

(Multiple Choice)
4.9/5
(38)

A continuous production process is most likely linked to which manufacturing environment?

(Multiple Choice)
4.8/5
(37)

The current time bucket lies in which time fence?

(Multiple Choice)
4.8/5
(28)

Which system calculates materials,subassemblies,and components required for end item production?

(Multiple Choice)
4.8/5
(39)

The sales and operations plan designs products at what level?

(Multiple Choice)
4.8/5
(42)

Changes to the master schedule during the frozen time fence may be requested only by the ______.

(Multiple Choice)
4.8/5
(31)

The furthest time bucket from the current period lies in which time fence?

(Multiple Choice)
4.7/5
(36)

In the part-period balancing lot-sizing technique,______.

(Multiple Choice)
4.9/5
(33)

The master schedule ______.

(Multiple Choice)
4.9/5
(41)

The process of breaking down product family requirements into individual end items is called ______.

(Multiple Choice)
4.9/5
(37)

The process of making raw materials,components,parts,or subassemblies available only when they're actually required is called ______.

(Multiple Choice)
4.9/5
(36)

With regard to time buckets,the difference between an integrated MRP-JIT system and an only-MRP system is that ______.

(Multiple Choice)
4.8/5
(29)

What is the process of breaking down an end item into the components and materials required called?

(Multiple Choice)
4.8/5
(38)

A benefit of MRP is a(n)______.

(Multiple Choice)
4.9/5
(35)

Filling customer orders received in the frozen time fence may require various considerations.Which of the following is NOT such a consideration?

(Multiple Choice)
4.7/5
(30)

To meet short-run demand and to facilitate production,aggregate units established by sales and operations planning are ______.

(Multiple Choice)
4.7/5
(31)

Which of these is used in JIT and integrated MRP-JIT systems?

(Multiple Choice)
4.7/5
(30)

MRP principles applied in the services industry can be called ______.

(Multiple Choice)
4.8/5
(33)