Exam 21: Master Scheduling and Material Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

In part-period balancing lot-sizing technique,______.

(Multiple Choice)
4.9/5
(38)

Disaggregation refers to breaking down end-product requirements into various requirements.Which of the following is NOT one of these requirements?

(Multiple Choice)
4.9/5
(46)

The time at which materials that have already been ordered will arrive is called ______.

(Multiple Choice)
4.9/5
(31)

Which of the following is NOT a category of decisions in operations and supply chain management?

(Multiple Choice)
4.9/5
(27)

A JIT system schedules ______.

(Multiple Choice)
4.7/5
(28)

Net requirements is calculated as ______.

(Multiple Choice)
4.7/5
(35)

The focus of the master schedule in an ATO production environment is ______.

(Multiple Choice)
4.9/5
(36)

Which of the following is NOT an input to master scheduling?

(Multiple Choice)
5.0/5
(33)

The planning horizons of master scheduling are determined ______.

(Multiple Choice)
5.0/5
(40)

An approach to reducing the effect of nervousness in an MRP system is to use ______.

(Multiple Choice)
4.9/5
(29)

The difference in time between planned order release and planned order receipt ______.

(Multiple Choice)
4.8/5
(31)

Which is the primary input to the MRP process?

(Multiple Choice)
4.9/5
(38)

When a company is not environmentally friendly ______.

(Multiple Choice)
4.8/5
(29)

Uncommitted inventory that is physically on-hand is called ______.

(Multiple Choice)
4.8/5
(43)

What is the process that identifies which parent item has generated requirements for a component called?

(Multiple Choice)
4.9/5
(36)

The lot-sizing technique which almost eliminates inventory-holding costs is ______.

(Multiple Choice)
4.8/5
(34)

In fixed-period ordering technique,______.

(Multiple Choice)
4.9/5
(36)

Checking for available capacity at the materials requirements planning level is done in which process?

(Multiple Choice)
4.8/5
(28)

The time when raw materials,components,or subassemblies are required is called the ______.

(Multiple Choice)
4.8/5
(37)

The difference between scheduled receipts and planned order receipts is that ______.

(Multiple Choice)
4.8/5
(26)