Exam 21: Master Scheduling and Material Requirements Planning
Exam 1: Introduction to Managing Global Operations and Supply Chains97 Questions
Exam 2: Operations and Supply Chain Strategies99 Questions
Exam 3: Project Management100 Questions
Exam 4: Supplement: Project Management100 Questions
Exam 5: Product and Service Innovations100 Questions
Exam 6: Supplement: Reliability98 Questions
Exam 7: Managing for Quality100 Questions
Exam 8: Quality Improvement and Control Tools100 Questions
Exam 9: Capacity Planning100 Questions
Exam 10: Supply Chain Design and Location Planning100 Questions
Exam 11: Process Design and Layout Planning100 Questions
Exam 12: Supplement: Tools for Analyzing, Designing, and Selecting Processes and Layouts99 Questions
Exam 13: Supplier Management100 Questions
Exam 14: Logistics Management100 Questions
Exam 15: Demand Management and Customer Service100 Questions
Exam 16: Demand Forecasting Methods100 Questions
Exam 17: Lean Operations and Supply Chains99 Questions
Exam 18: Inventory Management100 Questions
Exam 19: Inventory Control Models100 Questions
Exam 20: Sales and Operations Planning99 Questions
Exam 21: Master Scheduling and Material Requirements Planning100 Questions
Exam 22: Supplement: Capacity Requirements Planning, MRP II, ERP, and DRP100 Questions
Exam 23: Detailed Scheduling100 Questions
Exam 24: Linear Programming100 Questions
Exam 25: The Transportation Models100 Questions
Exam 26: Waiting Line Models100 Questions
Exam 27: Simulation100 Questions
Exam 28: Learning Curves99 Questions
Exam 29: Decision-Making Tools100 Questions
Select questions type
Information about supplier,lead time,and lot-size policy is contained in the ______.
(Multiple Choice)
4.9/5
(33)
Which capability of an MRP system helps identify which end items would be affected based on problems such as poor quality or late delivery?
(Multiple Choice)
4.8/5
(40)
Which one of the following is a variable to be considered when calculating production lot size?
(Multiple Choice)
4.8/5
(31)
A final assembly schedule is a part of the MPS in which manufacturing environment?
(Multiple Choice)
4.8/5
(36)
An additional input to an integrated MRP and JIT system is the ______.
(Multiple Choice)
4.9/5
(39)
Changes in which phase of the MPS will be the most disruptive?
(Multiple Choice)
4.9/5
(33)
The focus of the master schedule in an MTS production environment is ______.
(Multiple Choice)
4.9/5
(40)
The time intervals used in master scheduling are called ______.
(Multiple Choice)
4.9/5
(27)
Which production environment handles products that are custom designed and built to specific requirements?
(Multiple Choice)
4.9/5
(35)
A production lot size is scheduled when on-hand inventory falls ______.
(Multiple Choice)
4.8/5
(37)
Backflushing is a process where an end item's BOM is exploded to ______.
(Multiple Choice)
4.9/5
(29)
An output of integrated MRP-JIT systems,which is unavailable in an only-MRP system,is a ______.
(Multiple Choice)
4.8/5
(30)
Lots that are expected to be received in a particular period are ______.
(Multiple Choice)
4.7/5
(36)
The process of scheduling receipt of inventories,raw materials,and components as needed is called ______.
(Multiple Choice)
4.9/5
(35)
Which file provides information on machine capacity,machine time cost per unit,operation process time,and setup time?
(Multiple Choice)
4.9/5
(34)
Showing 61 - 80 of 100
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)