Exam 21: Master Scheduling and Material Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Information about supplier,lead time,and lot-size policy is contained in the ______.

(Multiple Choice)
4.9/5
(33)

A benefit of MRP is the ______.

(Multiple Choice)
4.9/5
(24)

Which capability of an MRP system helps identify which end items would be affected based on problems such as poor quality or late delivery?

(Multiple Choice)
4.8/5
(40)

Frequent changes to an MRP system cause the ______.

(Multiple Choice)
4.8/5
(26)

Master scheduling deals with products at what level?

(Multiple Choice)
4.9/5
(29)

Which one of the following is a variable to be considered when calculating production lot size?

(Multiple Choice)
4.8/5
(31)

A final assembly schedule is a part of the MPS in which manufacturing environment?

(Multiple Choice)
4.8/5
(36)

An additional input to an integrated MRP and JIT system is the ______.

(Multiple Choice)
4.9/5
(39)

Changes in which phase of the MPS will be the most disruptive?

(Multiple Choice)
4.9/5
(33)

The focus of the master schedule in an MTS production environment is ______.

(Multiple Choice)
4.9/5
(40)

The time intervals used in master scheduling are called ______.

(Multiple Choice)
4.9/5
(27)

Which production environment handles products that are custom designed and built to specific requirements?

(Multiple Choice)
4.9/5
(35)

A production lot size is scheduled when on-hand inventory falls ______.

(Multiple Choice)
4.8/5
(37)

Backflushing is a process where an end item's BOM is exploded to ______.

(Multiple Choice)
4.9/5
(29)

An output of integrated MRP-JIT systems,which is unavailable in an only-MRP system,is a ______.

(Multiple Choice)
4.8/5
(30)

Lots that are expected to be received in a particular period are ______.

(Multiple Choice)
4.7/5
(36)

The process of scheduling receipt of inventories,raw materials,and components as needed is called ______.

(Multiple Choice)
4.9/5
(35)

The output of the master schedule is a(n)______.

(Multiple Choice)
4.9/5
(33)

Which file provides information on machine capacity,machine time cost per unit,operation process time,and setup time?

(Multiple Choice)
4.9/5
(34)

The master schedule reflects demand from ______.

(Multiple Choice)
4.8/5
(39)
Showing 61 - 80 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)