Exam 21: Master Scheduling and Material Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Parent Item A requires two units of Item B and three units of Item C.Upon production of 500 units of Item A,it was calculated that 1,000 units of Item B were used in the production process.This an example of ______.

(Multiple Choice)
4.7/5
(33)

The output of individual production quantities of the end items to be produced at various points of the short-term planning horizon is called ______.

(Multiple Choice)
4.9/5
(30)

An MRP system works best in ______.

(Multiple Choice)
4.7/5
(35)

To facilitate production,it is necessary to ______.

(Multiple Choice)
4.7/5
(40)

A JIT system works best in ______.

(Multiple Choice)
4.9/5
(40)

A standard quantity issued to the production process is called ______.

(Multiple Choice)
4.7/5
(37)

The effectiveness of a master schedule depends on the ______.

(Multiple Choice)
4.9/5
(36)

The time between placing an order and receiving the item is called ______.

(Multiple Choice)
4.9/5
(40)

The leftover inventory from previous periods that is available at the start of a period is called ______.

(Multiple Choice)
4.8/5
(36)

The process of updating the master schedule and moving from one period to the next is called ______.

(Multiple Choice)
4.7/5
(35)

Which file contains data about materials,components,parts,and the assembling sequence of an end item?

(Multiple Choice)
4.9/5
(36)

A planning report is a ______ of the MRP process.

(Multiple Choice)
4.8/5
(33)

The amount of a particular item ordered from a supplier is called the ______.

(Multiple Choice)
4.8/5
(36)

Which of the following is an input to MRP?

(Multiple Choice)
4.8/5
(35)

To minimize the effects of uncertainty due to lead times,MRP systems incorporate ______.

(Multiple Choice)
4.8/5
(41)

Which of the following is relevant to operations and supply chain management?

(Multiple Choice)
4.8/5
(35)

MRP systems ensure that materials and components are available ______.

(Multiple Choice)
4.9/5
(31)

The changes in a net-change MRP system ______.

(Multiple Choice)
4.7/5
(31)

Changes in which phase of the MPS will be the least disruptive?

(Multiple Choice)
4.8/5
(36)

In an ATO production environment,which process is used to assemble modules and subassemblies into final product?

(Multiple Choice)
4.9/5
(30)
Showing 81 - 100 of 100
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)