Exam 7: B: Design of Work Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A 95% learning curve indicates greater learning than a 90% learning curve.

(True/False)
4.9/5
(36)

One use of learning curves is for negotiated purchasing.

(True/False)
4.8/5
(35)

A job has an 80% learning curve.If the first unit took 50 hours to complete,the third unit should take roughly how many hours?

(Multiple Choice)
5.0/5
(35)

On a log-log graph,learning curves appear as:

(Multiple Choice)
4.9/5
(32)

Assembly of a radar unit has a learning curve of 80 percent.Estimated time to assemble the second unit is 40 hours.Determine approximately how much time will be required for: (i)the eighth unit (ii)the first ten units

(Essay)
5.0/5
(38)

The learning curve is a basic tool for mass production type activities because it can deal with large volumes of output.

(True/False)
4.8/5
(33)

A job will have a learning rate of 75 percent.If the 3rd unit requires 10 hours,the 12th unit should require about this many hours:

(Multiple Choice)
4.7/5
(41)

The fact that human activities typically improve when they are done on a repetitive basis is described by a:

(Multiple Choice)
4.8/5
(39)
Showing 61 - 68 of 68
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)