An advantage of a U-shaped production line is that it facilitates teamwork and flexibility in work assignments.

(True/False)
4.8/5
(38)

For output to equal projected demand,what should be the actual cycle time for this production line?

(Multiple Choice)
4.7/5
(29)

For output to equal projected demand,what should be the actual cycle time for this assembly line?

(Multiple Choice)
4.8/5
(40)

Which of the following is not true about process design?

(Multiple Choice)
4.9/5
(38)

Service process design differs from manufacturing in that it outlines the flow of the customer or something belonging to the customer.

(True/False)
4.9/5
(35)

What are total weekly costs for the least costly process layout?

(Multiple Choice)
4.9/5
(31)

The substitution of human labour with machinery that has sensing and control devices is best described by the term:

(Multiple Choice)
4.8/5
(50)

A production line is to be designed for a job with three tasks.The task times are 0.5 minutes,1.8 minutes,and 1.1 minutes.If the necessary cycle time is 1.0 minutes per unit,what is the actual minimum number of workstations possible?

(Multiple Choice)
4.8/5
(29)

Process design is required only when new products or services are planned.

(True/False)
4.9/5
(42)

Repetitive process systems are typically used to produce goods for specific customer orders rather than goods to be held as finished product inventory in anticipation of demand.

(True/False)
5.0/5
(36)

Flexible automation consists of high-cost specialized equipment designed for a fixed sequence of operations.

(True/False)
4.9/5
(49)

N/C machines are best used in cases with all of the following characteristics EXCEPT:

(Multiple Choice)
4.8/5
(42)

Process layouts tend to have lower in-process inventories,and higher equipment utilization rates than product layouts.

(True/False)
4.8/5
(34)

If the consultant were to locate departments W,C,L,and E in areas I,II,III,and IV,respectively,what would be total weekly costs?

(Multiple Choice)
4.9/5
(33)

A disadvantage of automation is that it tends to increase variable costs for repetitive operational tasks.

(True/False)
4.9/5
(35)

Cellular layouts are like miniature versions of product layouts.

(True/False)
4.8/5
(35)

Given the following line balance data: Given the following line balance data:    -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the efficiency for the balance which uses the minimum number of stations? -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the efficiency for the balance which uses the minimum number of stations?

(Short Answer)
4.9/5
(31)

Which one of the following is not one of the steps used in manufacturing layout design?

(Multiple Choice)
4.7/5
(40)

For output to equal projected demand,what is the minimum number of workstations needed?

(Multiple Choice)
4.9/5
(38)

A grocery store would be categorized as a process layout.

(True/False)
5.0/5
(34)