The overall goals of CIM include all of the following EXCEPT?

(Multiple Choice)
4.8/5
(41)

The linking of a broad range of manufacturing and other activities through an integrated computer system is referred to as:

(Multiple Choice)
5.0/5
(32)

What is the distance (in metres)from area IV to area II in this new facility?

(Multiple Choice)
4.9/5
(44)

In a process flow diagram,the diamond shape shows which of the following?

(Multiple Choice)
4.7/5
(36)

Some of the benefits of cellular layouts are less material handling and reduced setup time.

(True/False)
4.8/5
(37)

With group technology items that are similar in either design or manufacturing requirements are grouped into part families.

(True/False)
4.9/5
(35)

Which type of automation is designed to achieve rapid changeover times when switching from one product to another?

(Multiple Choice)
4.8/5
(37)

For output to equal projected demand,what will the percentage idleness be of the production line that uses the minimum number of workstations?

(Multiple Choice)
5.0/5
(39)

In which type of processing system would sugar refining be done?

(Multiple Choice)
5.0/5
(42)

Flexible manufacturing systems (FMS)are intended to automate routine work tasks in high volume,low variety mass production industries such as the auto industry.

(True/False)
4.9/5
(37)

What is the total flow (loads per week)between department Y and department Z?

(Multiple Choice)
4.9/5
(41)

A possible disadvantage of a product layout is an inflexible response to changes in product mix.

(True/False)
4.9/5
(34)

Which of the following is not usually true about process layouts?

(Multiple Choice)
4.9/5
(33)

A production line is to be designed for a job with three tasks.The task times are 0.6 minutes,1.8 minutes,and 1.2 minutes.If the necessary cycle time is 1.2 minutes per unit,what is the theoretical minimum number of workstations?

(Multiple Choice)
4.9/5
(42)

"Balance delay" is another name for the percentage of idle time in a product layout.

(True/False)
4.8/5
(40)

The main issue in the design of process layouts concerns the relative positioning of:

(Multiple Choice)
4.7/5
(32)

Given the following line balance data: Given the following line balance data:    -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the minimum number of stations needed to achieve the appropriate cycle time? -For eight hours of operating time per day and a desired output rate of 960 units per day,what is the minimum number of stations needed to achieve the appropriate cycle time?

(Short Answer)
4.9/5
(37)

What is the distance (in metres)from area III to area I in this new facility?

(Multiple Choice)
4.9/5
(32)

In designing the layout of retail facilities the primary objective is to minimize cost.

(True/False)
4.9/5
(41)

For output to equal forecasted demand,what will be the second task performed at the second workstation of the production line that uses the fewest number of stations?

(Multiple Choice)
4.9/5
(32)