Acceptance sampling plans might call for selection of:

(Multiple Choice)
4.9/5
(36)

The AQL indicates:

(Multiple Choice)
4.8/5
(32)

The terms "consumer's risk" and "alpha risk" both refer to a Type I error.

(True/False)
4.8/5
(39)

The Quality Manager for Widgets,Inc.is concerned about the quality of the lot of several thousand widgets which his company produced this week and is now ready to ship.If he uses an acceptance sampling plan of n = 8 and c = 1,what is the probability that,if this lot is 10% defective,it will be accepted for shipment without inspection?

(Multiple Choice)
4.9/5
(38)

The AOQ shows:

(Multiple Choice)
4.9/5
(40)

The Quality Manager for Microelectronics,Inc.is concerned about the quality of the batch of several thousand IC's (integrated circuits)which his company is about to ship.If,based on his acceptance sample,he decides to ship this batch without inspection,which type error would be possible?

(Multiple Choice)
4.7/5
(36)

An OC curve shows:

(Multiple Choice)
4.8/5
(35)

The Quality Manager for Widgets,Inc.is concerned about the quality of the lot of several thousand widgets which his company produced this week and is now ready to ship.If he uses an acceptance sampling plan of n = 8 and c = 1,what is the probability that,if this lot is 15% defective,it will be rejected and completely inspected prior to shipment?

(Multiple Choice)
4.8/5
(31)

Given the following acceptance sampling data for a lot of several thousand units of a finished good: Given the following acceptance sampling data for a lot of several thousand units of a finished good:    What is the point of indifference between 100 percent inspection or shipment without inspection? What is the point of indifference between 100 percent inspection or shipment without inspection?

(Short Answer)
4.9/5
(33)

A Quality Inspector for Alpha-Beta Co.is concerned about the quality of the batch of several thousand Gizmos which his company produced this week and is preparing to ship.If he uses an acceptance sampling plan of n = 5 and c = 2,what will be the average outgoing quality (AOQ)for batches with 40% defectives?

(Multiple Choice)
4.9/5
(34)

Acceptance sampling procedures can be applied to both attribute and variable inspection.

(True/False)
4.9/5
(38)

In a single-sampling plan,the entire lot,or batch of items,is accepted or rejected based upon only one specified sized sample.

(True/False)
4.8/5
(43)

Shipments of bowling balls are sampled before delivery to a warehouse.Lots of 600 balls are checked,using 10 observations from each lot.Any lot with more than one defective is rejected.Calculate values for the operating characteristic curve for this sampling plan.

(Essay)
4.9/5
(33)

The cost and time required for inspection dictate the type of sampling plan used.

(True/False)
4.8/5
(38)

The purpose of acceptance sampling is to decide whether a batch of items satisfies predetermined standards.

(True/False)
4.9/5
(35)

Acceptance sampling is applied to batches of items during the production process.

(True/False)
4.7/5
(44)

Acceptance sampling is a form of inspection applied to items that are part of an ongoing process.

(True/False)
4.9/5
(34)

Inspection that occurs during the production process is known as acceptance sampling.

(True/False)
5.0/5
(31)

Given the following acceptance sampling data for a lot of several thousand units of a finished good: Given the following acceptance sampling data for a lot of several thousand units of a finished good:    If c = 2,what is the probability that,if this lot were 5% defective,it would be accepted for shipment without inspection?  10% defective?  15%?  20%? If c = 2,what is the probability that,if this lot were 5% defective,it would be accepted for shipment without inspection? 10% defective? 15%? 20%?

(Short Answer)
4.9/5
(39)

A Quality Inspector for Alpha-Beta Co.is concerned about the quality of the batch of several thousand Gizmos which his company produced this week and is preparing to ship.If,based on his acceptance sample,he decides to ship this batch without inspection,which type of error would be possible?

(Multiple Choice)
4.9/5
(45)