Probably the most important function of organization culture is to clarify and reinforce standards of behavior within the organization.

(True/False)
4.9/5
(31)

Identify and briefly describe the three basic project management structures.

(Short Answer)
4.7/5
(29)

Research suggests that there is a strong connection between project management structure, organization ________, and project success.

(Short Answer)
4.8/5
(31)

The structure that manages projects within the existing organizational structure is __________ organization.

(Multiple Choice)
4.7/5
(30)

The ________ matrix form of project organization can achieve better equilibrium between technical and project requirements, but it is a very delicate system to create and manage.

(Short Answer)
4.9/5
(43)

Who is responsible for determining what tasks have to be done in a matrix project management structure?

(Multiple Choice)
4.9/5
(43)

While organization culture is important to the overall function of an organization, it has minor influence on its project management.

(True/False)
4.9/5
(35)

Matrix management violates the management principle of ________.

(Short Answer)
4.8/5
(40)

Organizations have difficulty in creating a system for managing projects because

(Multiple Choice)
4.8/5
(43)

A project team that operates with a full-time project manager as a separate unit from the rest of the organization is structured as a ________ organization.

(Multiple Choice)
4.9/5
(40)

Which of the following is not one of the typical forms of a project management office?

(Multiple Choice)
4.7/5
(35)

The ________ structure is designed to optimally utilize resources by having individuals work on multiple projects as well as being capable of performing normal functional duties.

(Short Answer)
4.9/5
(33)

Factors in identifying cultural characteristics include all the following except

(Multiple Choice)
4.7/5
(32)

Whether a matrix is weak or strong is determined by the extent to which the project manager has direct authority over project participants.

(True/False)
4.9/5
(33)