Exam 5: Estimating Project Times and Costs

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Identify the drawbacks to an excessive level of detail in estimating project times and costs.

(Essay)
4.8/5
(35)

Describe phase estimating.When should it be used and how is it different from all other top-down and bottom-up methods of estimating?

(Not Answered)
This question doesn't have any answer yet
Ask our community

Under what conditions would the bottom-up approach to estimating project times and costs be the best choice?

(Not Answered)
This question doesn't have any answer yet
Ask our community

Which of the following would best represent direct project costs?

(Multiple Choice)
4.9/5
(34)

As long as everyone in a project adds a little padding to reduce risk,the project duration and cost estimates will be more accurate.

(True/False)
4.7/5
(36)

Janet is forecasting how much money her department needs to support a new project.She estimates that two people and $25,000 in expenses will cover her needs.Because management typically insists on reducing forecasts by 20 percent,she increases her estimates to allow for that reduction.Which of the following factors is illustrated in this situation?

(Multiple Choice)
4.8/5
(39)

Estimates should be made based on ___________ conditions,efficient methods,and a normal level of resources.

(Short Answer)
4.7/5
(42)

Estimates should be based on normal conditions,efficient methods,and a normal level of resources.Explain.

(Not Answered)
This question doesn't have any answer yet
Ask our community

List and briefly describe four reasons why estimating time and cost are important to project management.

(Not Answered)
This question doesn't have any answer yet
Ask our community

Which of the following does NOT help describe a bottom-up estimating approach?

(Multiple Choice)
5.0/5
(26)

In practice,estimating processes are frequently classified as

(Multiple Choice)
4.8/5
(35)

The salary of the project manager and her administrative assistant is classified as direct labor costs.

(True/False)
4.8/5
(38)

The information necessary to conduct a bottom-up estimate of project time and costs starts with the ___________.

(Short Answer)
5.0/5
(29)

Richard is collecting estimates for a house that he will have the funding to build in 12 months.Which of the following factors does Richard need to consider in regard to the quality of these estimates?

(Multiple Choice)
4.8/5
(39)

The bottom-up approach for estimating times and costs that uses costs from past projects that were similar to the current project is known as

(Multiple Choice)
4.9/5
(42)

Costs that are not directly related to a specific project,such as advertising,accounting,and senior management's salary,are classified as _____________ costs.

(Short Answer)
4.9/5
(36)

Refining estimates may be necessary for a number of reasons.For example,people working on prototype development needing time to interact with the design engineers after the design is completed is a good example of

(Multiple Choice)
4.9/5
(38)

Which of the following is a good condition for top-down estimating?

(Multiple Choice)
4.7/5
(43)

The estimating approach that is best to use on projects where there is an unusual amount of uncertainty surrounding the project and when it is impractical to estimate times and costs for the entire project is known as ___________.

(Short Answer)
4.9/5
(34)

Work package estimates should include allowances for contingencies.

(True/False)
4.8/5
(37)