Increasing the capacity of a work center that is a bottleneck increases output.

(True/False)
4.9/5
(32)

If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date) If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date)

(Multiple Choice)
4.8/5
(31)

If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days)is (assume zero for today's date) If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days)is (assume zero for today's date)

(Multiple Choice)
4.8/5
(40)

The process of assigning work to limited resources is known as scheduling.

(True/False)
5.0/5
(29)

Scheduling using the theory of constraints (TOC)requires that process batch sizes and transfer batch sizes always match.

(True/False)
4.8/5
(41)

The first-come,first-served (FCFS)sequencing rule should be only used when operating at high levels of capacity.

(True/False)
4.7/5
(30)

The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is

(Multiple Choice)
4.7/5
(38)

If the following jobs are sequenced according to the DDATE rule then the mean tardiness (in days)for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the DDATE rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)

(Multiple Choice)
4.8/5
(37)

If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days)is (assume zero for today's date) If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days)is (assume zero for today's date)

(Multiple Choice)
4.9/5
(36)

Gantt charts show the planned and yet to be completed activities against total activities.

(True/False)
4.9/5
(38)

Input/output control provides the information necessary to regulate work flow in a job shop environment.

(True/False)
4.8/5
(37)

If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date) If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date)

(Multiple Choice)
4.8/5
(38)

If the following jobs are sequenced according to the LPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the LPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)

(Multiple Choice)
4.8/5
(32)

If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days)for all jobs is (assume zero for today's date) If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)

(Multiple Choice)
4.9/5
(35)

The scheduling function for mass production and job shop production are basically the same.

(True/False)
4.8/5
(38)

If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date) If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date)

(Multiple Choice)
4.9/5
(38)

Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below. Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.   If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to

(Multiple Choice)
4.8/5
(41)

If the work remaining is greater than the time remaining,the critical ratio (CR)will be

(Multiple Choice)
4.8/5
(32)

The sequencing rule that will minimize average job completion time for a set number of jobs to be processed on one machine is

(Multiple Choice)
4.8/5
(32)

The process of assigning work to limited resources is known as

(Multiple Choice)
5.0/5
(42)