Exam 17: Scheduling
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
Increasing the capacity of a work center that is a bottleneck increases output.
(True/False)
4.9/5
(32)
If the following jobs are sequenced according to the FCFS rule then job C is completed on day (assume zero for today's date)


(Multiple Choice)
4.8/5
(31)
If the following jobs are sequenced according to the SLACK rule then the maximum job tardiness (in days)is (assume zero for today's date)


(Multiple Choice)
4.8/5
(40)
The process of assigning work to limited resources is known as scheduling.
(True/False)
5.0/5
(29)
Scheduling using the theory of constraints (TOC)requires that process batch sizes and transfer batch sizes always match.
(True/False)
4.8/5
(41)
The first-come,first-served (FCFS)sequencing rule should be only used when operating at high levels of capacity.
(True/False)
4.7/5
(30)
The following set of jobs must be processed serially through a two-step system.The times at each process are in hours.If Johnson's Rule is used to sequence the jobs then the makespan time (in hours)for all jobs is


(Multiple Choice)
4.7/5
(38)
If the following jobs are sequenced according to the DDATE rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)


(Multiple Choice)
4.8/5
(37)
If the following jobs are sequenced according to the LPT rule then the maximum job tardiness (in days)is (assume zero for today's date)


(Multiple Choice)
4.9/5
(36)
Gantt charts show the planned and yet to be completed activities against total activities.
(True/False)
4.9/5
(38)
Input/output control provides the information necessary to regulate work flow in a job shop environment.
(True/False)
4.8/5
(37)
If the following jobs are sequenced according to the SPT rule then job B is completed on day (assume zero for today's date)


(Multiple Choice)
4.8/5
(38)
If the following jobs are sequenced according to the LPT rule then the mean completion time (in days)for all jobs is (assume zero for today's date)


(Multiple Choice)
4.8/5
(32)
If the following jobs are sequenced according to the SLACK rule then the mean tardiness (in days)for all jobs is (assume zero for today's date)


(Multiple Choice)
4.9/5
(35)
The scheduling function for mass production and job shop production are basically the same.
(True/False)
4.8/5
(38)
If the following jobs are sequenced according to the SLACK rule then job A would be completed on day (assume zero for today's date)


(Multiple Choice)
4.9/5
(38)
Four products (1,2,3,and 4)must be processed on one of four machines (A,B,C,and D).The times required in minutes for each product on each machine are shown below.
If management wishes to assign products to machines so that the total time to complete all the products is minimized,then Product 4 is assigned to

(Multiple Choice)
4.8/5
(41)
If the work remaining is greater than the time remaining,the critical ratio (CR)will be
(Multiple Choice)
4.8/5
(32)
The sequencing rule that will minimize average job completion time for a set number of jobs to be processed on one machine is
(Multiple Choice)
4.8/5
(32)
The process of assigning work to limited resources is known as
(Multiple Choice)
5.0/5
(42)