Exam 14: Material Requirements Planning Mrpand ERP
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management121 Questions
Exam 4: Forecasting144 Questions
Exam 5: Sustainability in the Supply Chain and Design of Goods and Services137 Questions
Exam 6: Managing Quality129 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 8: Location Strategies139 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand ERP169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations137 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 20: Supply Chain Management Analytics55 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
________ is a lot-sizing technique that generates exactly what is required to meet the plan.
Free
(Essay)
4.9/5
(30)
Correct Answer:
Lot-for-lot
It is week 1 and there are currently 20 As in stock.The MPS calls for 300 As at the start of week 5.If there are scheduled receipts planned for week 3 and week 4 of 120 As each and A has a lead time of 1 week when and how large of an order should be placed to meet the requirement of 300 As?
Free
(Multiple Choice)
4.7/5
(28)
Correct Answer:
D
Planning bills of material are bills of material for "kits" of inexpensive items such as washers,nuts,and bolts.
Free
(True/False)
4.8/5
(35)
Correct Answer:
True
________ refers to the time units in a material requirements planning (MRP)system.
(Essay)
4.8/5
(38)
________ is a dependent demand technique that uses a bill of material,inventory,expected receipts,and a master production schedule to determine material requirements.
(Essay)
4.8/5
(38)
Consider the bill of material for Product J and the data given in the following table.The gross requirements for J are 200 units in week 6 and 250 units in week 8.Develop the MRP tables for each item for an 8-week planning period.Use the lot-for-lot lot-sizing rule.



(Essay)
4.8/5
(30)
The MPS calls for 110 units of Product A.There are currently 60 of Product A on hand.Each A requires 4 of Part B.There are 20 units of B available.The net requirements for B are
(Multiple Choice)
5.0/5
(39)
The lot-for-lot lot-sizing technique is particularly appropriate when demand is not very smooth and set up cost is small compared to holding cost.
(True/False)
4.8/5
(30)
Linking a part requirement with the parent component that caused the requirement is referred to as
(Multiple Choice)
4.8/5
(31)
Each R requires 2 of component S and 1 of part T.The lead time for assembly of R is 3 days.The lead time for the manufacture of S is 5 days.The lead time for the manufacture of T is 10 days.The cumulative lead time for R is ________ days.
(Multiple Choice)
4.8/5
(30)
Product A is made from 2 Bs and 1 C.Lead times for A,B,and C are 2,3,and 2 weeks respectively.Currently there are 2 Bs and a 5 Cs on hand,with 5 of each scheduled to arrive at the end of week 1.If 20 As are needed during week 4,can the order be completed (it is the start of week 0 currently)?
(Essay)
4.9/5
(33)
Reduced inventory levels and faster response to market changes are both benefits of MRP.
(True/False)
4.9/5
(30)
What lot-sizing technique is generally preferred when inventory holding costs are extremely high?
(Multiple Choice)
4.8/5
(31)
The quantity required of a dependent demand item is computed from the demand for the final products in which the item is used.
(True/False)
4.9/5
(26)
Dependent demand and independent demand items differ in that
(Multiple Choice)
4.9/5
(36)
A very simple product (A)consists of a base (B)and a casting (C).The base consists of a plate (P)and three fasteners (F).There are currently 30 castings and 100 bases on hand.Final assembly takes one week.The casting has a lead time of three weeks.All other parts have one week lead times.There are no scheduled receipts.All components are lot-for-lot.The MPS requires 80 units of product A in week 5 and 120 in week 8.Produce the MRP for the upcoming eight weeks.Produce a list of all planned order releases.
(Essay)
4.8/5
(27)
A grill assembly takes 20 washers.Instead of listing these washers separately they are grouped into a single kit for production.The bill of material for the washers is classified as
(Multiple Choice)
4.8/5
(34)