Exam 3: Project Management
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management121 Questions
Exam 4: Forecasting144 Questions
Exam 5: Sustainability in the Supply Chain and Design of Goods and Services137 Questions
Exam 6: Managing Quality129 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 8: Location Strategies139 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand ERP169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations137 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 20: Supply Chain Management Analytics55 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
________ is the amount of time an individual activity in a network can be delayed without delaying the entire project.
Free
(Essay)
4.8/5
(36)
Correct Answer:
Slack time
Slack is the amount of time an activity can be delayed without delaying the entire project.
Free
(True/False)
5.0/5
(30)
Correct Answer:
True
Which of the following statements regarding PERT analysis is true?
(Multiple Choice)
4.8/5
(37)
An activity on a PERT network has these time estimates: optimistic = 2,most likely = 5,and pessimistic = 10.Its expected time is
(Multiple Choice)
4.8/5
(39)
Which of the following statements regarding PERT times is true?
(Multiple Choice)
4.9/5
(30)
The critical path for the network activities shown below is ________ with duration ________. 

(Multiple Choice)
4.9/5
(28)
What are the earliest activity start time and latest activity start time,and how are they computed?
(Essay)
4.9/5
(35)
The PERT pessimistic time estimate is an estimate of the minimum time an activity will require.
(True/False)
4.8/5
(25)
Which of the following statements regarding time-cost tradeoffs in CPM networks is false?
(Multiple Choice)
4.8/5
(34)
A project being analyzed by PERT has 60 activities,13 of which are on the critical path.If the estimated time along the critical path is 214 days with a project variance of 100,the probability that the project will take 224 days or more to complete is
(Multiple Choice)
4.7/5
(38)
A simple CPM network has three activities,D,E,and F.D is an immediate predecessor of E and of F.E is an immediate predecessor of F.The activity durations are D = 5,E = 4,F = 9.
(Multiple Choice)
4.9/5
(50)
Briefly discuss what is meant by critical path analysis.What are critical path activities and why are they important?
(Essay)
4.8/5
(32)
What are the three phases of a project? Describe each in a sentence or two.
(Essay)
5.0/5
(33)
A network consists of the activities in the following list.Times are given in weeks.
a.Draw the network diagram.
b.Calculate the ES,EF,LS,LF,and Slack for each activity.
c.What is project completion time?

(Essay)
4.9/5
(35)
Work Breakdown Structure is a useful tool in project management because it addresses the timing of individual work elements.
(True/False)
4.9/5
(41)
If an activity whose normal duration is 13 days can be shortened to 10 days for an added cost of $1,500,the crash cost per period is
(Multiple Choice)
4.9/5
(28)
In PERT analysis,the identification of the critical path can be incorrect if a noncritical activity takes substantially more than its expected time.
(True/False)
4.9/5
(39)
In project management,crashing an activity must consider the impact on all paths in the network.
(True/False)
4.9/5
(42)