Exam 10: Human Resources,job Design,and Work Measurement
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management121 Questions
Exam 4: Forecasting144 Questions
Exam 5: Sustainability in the Supply Chain and Design of Goods and Services137 Questions
Exam 6: Managing Quality129 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 8: Location Strategies139 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand ERP169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations137 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 20: Supply Chain Management Analytics55 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
________ is an approach that specifies the tasks that constitute a job for an individual or a group.
Free
(Essay)
4.9/5
(28)
Correct Answer:
Job design
Methods analysis employs which of the following charts in its analysis of the movement of workers and materials?
Free
(Multiple Choice)
4.7/5
(34)
Correct Answer:
B
Managers should seek to control such work environment factors as
Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
E
Properly set labour standards represent the amount of time that it should take an average employee to perform specific job activities under ________.
(Essay)
4.9/5
(32)
Personal and fatigue allowances can include amounts for the effects of lighting,heat and humidity,and noise.
(True/False)
4.8/5
(33)
List the eight steps used to develop a time study-based labour standard.
(Essay)
4.9/5
(35)
A manufacturing plant assembly line job has a standard time of 5 minutes.A worker with a performance rating of 87% is assigned the task and given an allowance factor of 13%.What is the worker's average observed time?
(Essay)
4.7/5
(34)
"Designed to show economy of motion by pointing out waste motion and idle time" describes
(Multiple Choice)
4.7/5
(36)
"Visual workplace" is a term coined by Hawthorne,and refers to the need for proper lighting at employee workstations.
(True/False)
4.7/5
(43)
Suppose that the allowance factor for a job is 0.10 and the normal time is 5 hours.What is the standard time?
(Multiple Choice)
4.8/5
(33)
What is a "normal" pace,and what is its connection to normal time and labour standards?
(Essay)
4.8/5
(40)
"Schematic used to investigate movement of people or material" describes a(n)
(Multiple Choice)
4.9/5
(32)
Describe how the "visual workplace" can increase information flow,improve efficiency,and eliminate non-value-adding activities.Support your argument with a few examples.
(Essay)
4.8/5
(26)
The behavioral approach to job design that involves giving the worker a larger portion of the total task is
(Multiple Choice)
4.8/5
(34)
A time-study procedure involves timing a sample of worker's performance and using it to set a standard.
(True/False)
4.9/5
(36)
Showing 1 - 20 of 192
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)