Exam 16: Jit and Lean Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

TPS stands for ________.

Free
(Short Answer)
4.8/5
(35)
Correct Answer:
Verified

Toyota Production System

Which one of the following is an example of JIT being used for competitive advantage?

Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
Verified

A

A scheduler may find that freezing the portion of the schedule closest to the due dates allows the production system to function and the schedule to be met.

Free
(True/False)
4.9/5
(35)
Correct Answer:
Verified

True

What does TPS stand for?

(Essay)
4.9/5
(33)

Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of   a day.Each container (kanban)holds 1 cake.What is the correct number of kanbans? a day.Each container (kanban)holds 1 cake.What is the correct number of kanbans?

(Multiple Choice)
4.9/5
(35)

Which of the following is generally found in most JIT environments?

(Multiple Choice)
4.9/5
(27)

When suppliers are encouraged to locate near manufacturing plants,the goal of the JIT partnership is to reduce ________ inventory.

(Essay)
4.9/5
(36)

Lead time for computers is 5 days with daily demand of 25 and safety stock of 5 computers.If management wants to use 10 kanbans how many computers should each one hold?

(Multiple Choice)
4.7/5
(35)

The first step in reducing setup times is the separation of setup into preparation activities and actual setup,so that as much work as possible can be done while the machine or process is operating.

(True/False)
4.9/5
(34)

Describe level schedules.What purpose do they serve?

(Essay)
4.8/5
(36)

Lead time for computers is 7 days with daily demand of 5 computers and a safety stock of 1 day.Each kanban holds 8 computers.What is the correct number of kanbans?

(Multiple Choice)
4.8/5
(39)

Level scheduling means producing at a constant rate,regardless of customer demands.

(True/False)
4.9/5
(40)

Lower average inventory is feasible only if setup times are short.

(True/False)
5.0/5
(32)

What does TPS stand for?

(Multiple Choice)
4.9/5
(38)

What are the five reasons given by suppliers for their reluctance to enter into JIT systems? Elaborate on one of these,of your choosing.

(Essay)
4.9/5
(29)

Kanban is associated with all of the following except

(Multiple Choice)
4.9/5
(33)

Labor cost for set-up is $500/hour.If the plant plans on level material use and operates 50 days per year,determine the time it takes to setup. Labor cost for set-up is $500/hour.If the plant plans on level material use and operates 50 days per year,determine the time it takes to setup.

(Essay)
4.8/5
(30)

Which of the following is not a concern of suppliers as they prepare to enter into JIT partnerships?

(Multiple Choice)
4.8/5
(37)

A kanban system requires little variability in lead time because shortages have their impact on the entire productive system.

(True/False)
4.9/5
(32)

Differentiate between a push and a pull system.

(Essay)
4.9/5
(39)
Showing 1 - 20 of 137
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)