One of the four things needed for aggregate planning is a logical overall unit for measuring sales and output.

Free
(True/False)
4.8/5
(37)
Correct Answer:
Verified

True

Osprey Fabrication has the following aggregate demand requirements and other data for the upcoming four quarters. Osprey Fabrication has the following aggregate demand requirements and other data for the upcoming four quarters.    Which of the following production plans is better: Plan A-chase demand by hiring and layoffs;Plan B-pure level strategy,or Plan C-1350 level with the remainder by subcontracting? Which of the following production plans is better: Plan A-chase demand by hiring and layoffs;Plan B-pure level strategy,or Plan C-1350 level with the remainder by subcontracting?

Free
(Essay)
4.8/5
(36)
Correct Answer:
Verified

Plan A will cost $215,000,Plan B will cost $179,500,and Plan C will cost $183,500.Plan B is the cheapest,by a small margin.
Plan A
Osprey Fabrication Solution
Plan A will cost $215,000,Plan B will cost $179,500,and Plan C will cost $183,500.Plan B is the cheapest,by a small margin. Plan A Osprey Fabrication Solution    Plan B Osprey Fabrication Solution    Plan C Osprey Fabrication Solution   Plan B
Osprey Fabrication Solution
Plan A will cost $215,000,Plan B will cost $179,500,and Plan C will cost $183,500.Plan B is the cheapest,by a small margin. Plan A Osprey Fabrication Solution    Plan B Osprey Fabrication Solution    Plan C Osprey Fabrication Solution   Plan C
Osprey Fabrication Solution
Plan A will cost $215,000,Plan B will cost $179,500,and Plan C will cost $183,500.Plan B is the cheapest,by a small margin. Plan A Osprey Fabrication Solution    Plan B Osprey Fabrication Solution    Plan C Osprey Fabrication Solution

Normally,the transportation model is used to solve problems involving several physical sources of product and several physical uses of the product,as in factories and warehouses.How is it possible to use the transportation model where the "routes" are from one time period to another? Describe how this provides aggregate planners with a usable mathematical model.

Free
(Essay)
4.9/5
(37)
Correct Answer:
Verified

Time travel is not involved."From" regular time March "To" demand May simply describes when production took place to provide the units sold in May."From" April production "To" March demand simply describes back orders - demand in one month is met by production in a later period.The algorithm is optimizing - it minimizes cost over the planning period;the algorithm balances supply and demand by combinations of capacity options and demand options.

Which of the following statements about aggregate planning is true?

(Multiple Choice)
4.8/5
(33)

Which of these is among the demand options of aggregate planning?

(Multiple Choice)
4.8/5
(36)

The planning tasks associated with staffing,production,inventory,and sub-contracting levels typically fall under

(Multiple Choice)
4.9/5
(39)

Osprey Machine Works has the following demand requirements and other data for the upcoming four quarters. Osprey Machine Works has the following demand requirements and other data for the upcoming four quarters.    What is the total cost of pursuing a level aggregate plan over the coming year? What is the total cost of pursuing a level aggregate plan over the coming year?

(Essay)
4.8/5
(37)

One question that operations managers must ask when generating an aggregate plan is what factors are likely to influence demand and by how much.

(True/False)
4.8/5
(29)

In aggregate planning,one of the adjustable elements of capacity is the extent of subcontracting.

(True/False)
4.8/5
(41)

Which of the following is not an advantage of level scheduling?

(Multiple Choice)
4.7/5
(31)

A small private university normally charges the same price-$200-per credit-hour for all courses and for all students.While the university is pretty near capacity in the fall and spring,it finds that its classrooms are only about 60% occupied during the summer session.A student of operations management (who has recently read this chapter)wonders if yield management might be useful to both the university and its students alike.This student,with help from some economics majors,estimates a demand curve for summer course enrollment.Points on this demand curve include 9000 credit-hours at the current rate of $200,12,000 credit hours at $180,15,000 credit-hours at $160,and 18,000 credit-hours at $140.Based on this demand curve,what price point would best serve the university,if its objective is the greatest revenue for the summer session?

(Essay)
4.9/5
(35)

What directly results from disaggregation of an aggregate plan?

(Multiple Choice)
4.8/5
(34)

"Yield management" is best described as

(Multiple Choice)
4.8/5
(34)

Which of these aggregate planning strategies adjusts capacity to match demand?

(Multiple Choice)
5.0/5
(37)

Disaggregation is the process of breaking the aggregate plan into greater detail;one example of this detail is the Master Production Schedule.

(True/False)
4.8/5
(30)

________ is the process of breaking the aggregate plan into greater detail.

(Essay)
4.8/5
(39)

Which of the following actions is consistent with the use of pure level strategy?

(Multiple Choice)
4.8/5
(42)

Which of the following aggregate planning strategies is a "capacity option"?

(Multiple Choice)
5.0/5
(29)

________ work with a few variables at a time and are easy to understand and use.

(Essay)
5.0/5
(37)

A professional services firm is investigating yield management as a means of taking advantage of unused capacity.Analysts for this firm estimate a demand curve for the firm's service,which is sold by the hour.Points on this demand curve include 9000 hours at the current rate of $60 per hour,9500 hours at $55,10,000 hours at $50,and 10,500 hours at $45.Based on this demand curve,what price point would be best for the firm,if its objective is maximum revenue?

(Essay)
4.9/5
(38)