Exam 16: Just-In-Time and Lean Options
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management123 Questions
Exam 4: Forecasting142 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 7: Process Strategy129 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources, Job Design, and Work Measurement191 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrp and Erp172 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Just-In-Time and Lean Options138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 18: Statistical Tools for Managers97 Questions
Exam 19: Acceptance Sampling99 Questions
Exam 20: The Simplex Method of Linear Programming94 Questions
Exam 21: The Modi and Vam Methods of Solving Transportation Problems135 Questions
Exam 22: Vehicle Routing and Scheduling111 Questions
Exam 23 Managing Quality155 Questions
Exam 24: Process Strategy107 Questions
Exam 25: Supply-Chain Management73 Questions
Exam 26: Vehicle Routing and Scheduling92 Questions
Select questions type
The Toyota Production System requires that activities have built-in, automatic tests so that gaps between expectations and actuality are immediately evident.
(True/False)
4.8/5
(27)
Which one of the following is a characteristic of a JIT partnership?
(Multiple Choice)
4.9/5
(41)
Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of ½ a day. Each container (kanban) holds 1 cake. What is the correct number of kanbans?
(Multiple Choice)
4.8/5
(32)
__________ is the minimum inventory necessary to keep a perfect system running.
(Short Answer)
4.9/5
(33)
A firm wants to develop a level material use schedule based on the following data. What should be the setup cost? 

(Multiple Choice)
4.9/5
(38)
You have read that in JIT and lean production the optimum lot size is one, with some exceptions for packaging and physical limitations. If a product currently has a lot size of 25, what must happen to setup time for the lot size to truly fall to one? Data for this problem are D=100 units, S=$75 based on setup time of 50 minutes at $1.50 per minute, and H=$40 per unit per year.
(Essay)
4.9/5
(33)
The main focus of JIT efforts to reduce investment in inventory requires __________.
(Short Answer)
4.8/5
(34)
Excess bags of basic commodities such as flour and sugar that are stored in a restaurant's kitchen represent which of the following wastes?
(Multiple Choice)
4.7/5
(44)
Explain how JIT works in services. After all, how does "small lot size" and "reduce setup cost" make sense in services? Supply examples to support your work.
(Essay)
4.8/5
(29)
Which of the following is not an attribute of lean operations?
(Multiple Choice)
4.9/5
(40)
The list of 5S's, although it looks like a housekeeping directive, supports lean production by
(Multiple Choice)
4.7/5
(36)
If a casual-dining restaurant is attempting to practice JIT and lean operations, which of the following would not be present?
(Multiple Choice)
4.8/5
(31)
In a JIT system, product inspection adds value by identifying defective items.
(True/False)
4.8/5
(27)
Which one of the following is not a layout tactic in a JIT environment?
(Multiple Choice)
4.7/5
(42)
A bakery uses 6 containers that each hold 4 cakes. If safety stock is 2 cakes and lead time is 11 days, determine daily demand.
(Essay)
4.8/5
(37)
A grocery store is attempting to implement a kanban system. Which of the following would not be an application of kanbans?
(Multiple Choice)
4.8/5
(39)
Showing 21 - 40 of 138
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)