__________ is the Japanese word for card that has come to mean "signal."

(Short Answer)
5.0/5
(33)

The number of kanbans should be equal to

(Multiple Choice)
4.8/5
(37)

Which of the following is true regarding the steps to reducing setup times?

(Multiple Choice)
4.8/5
(33)

Which of the following is false regarding the links between JIT and quality?

(Multiple Choice)
4.8/5
(29)

Identify the inventory tactics appropriate for a JIT environment.

(Essay)
4.7/5
(32)

Labor cost for set-up is $500/hour. If the plant plans on level material use and operates 50 days per year, determine the time it takes to setup. Labor cost for set-up is $500/hour. If the plant plans on level material use and operates 50 days per year, determine the time it takes to setup.

(Essay)
4.8/5
(36)

Which one of the following statements is true regarding JIT inventory?

(Multiple Choice)
4.8/5
(32)

Identify JIT policies for and expectations of suppliers.

(Essay)
4.8/5
(35)

In the quest for competitive advantage, which of the following is a JIT requirement?

(Multiple Choice)
4.8/5
(34)

In JIT partnerships, suppliers have several concerns. Which of the following is not such a concern?

(Multiple Choice)
4.9/5
(37)

The word "kanban" means

(Multiple Choice)
4.9/5
(43)

Daily usage of a part is 20 in a facility that operates 250 days of the year. Setup cost is $20 and annualized carrying cost is $210. Production of this part occurs at the rate of 50 per day when production of the part is underway. Lead time is 1 day; safety stock is 1/2 day's production. What is the optimum kanban size, and number of kanbans?

(Short Answer)
4.7/5
(32)

The 5S term __________ includes analysis to improve workflow and reduce wasted motion.

(Short Answer)
4.8/5
(39)

Concerning relationships with suppliers, which of the following combinations is critical to the success of JIT?

(Multiple Choice)
4.8/5
(32)

Which of the following is not a goal of JIT partnerships?

(Multiple Choice)
4.9/5
(39)

Daily usage of an assembly is 100 in a facility that operates 300 days of the year. Setup cost is $5 and annualized carrying cost is $160. Production of this assembly occurs at the rate of 400 per day when production of the assembly is underway. Lead time is 3 days; safety stock is 1/2 day's production. What is the optimum kanban size, and number of kanbans?

(Short Answer)
4.8/5
(28)

TPS stands for Total Production Streamlining.

(True/False)
4.9/5
(29)

Many suppliers feel that having a variety of customers is better than being tied to long-term contracts with one customer.

(True/False)
4.8/5
(28)

Kanban is associated with all of the following except

(Multiple Choice)
4.8/5
(30)

Lower average inventory is feasible only if setup times are short.

(True/False)
4.8/5
(40)