The project scope document contains

(Multiple Choice)
4.9/5
(38)

The WBS is ____ of deliverables or end items that will be accomplished or produced by the project team or contractor during the project.

(Multiple Choice)
4.9/5
(33)

If something is ____ the statement of work, then it should be assumed that ____.

(Multiple Choice)
4.7/5
(26)

Each activity in a network diagram is represented by a box in the ____, and the ____ of the activity is written within the box.

(Multiple Choice)
4.7/5
(36)

The Gantt chart combines the two functions of ____.

(Multiple Choice)
4.9/5
(36)

A change control system needs to be established to define how

(Multiple Choice)
4.9/5
(37)

The work package includes all of the specific work activities that need to be performed to produce the deliverable associated with that work package.

(True/False)
4.8/5
(36)

The ____ defines what the project team or contractor will do.

(Multiple Choice)
4.8/5
(30)

Contractor requirements define the functional or performance specifications for the project's end product and other project deliverables.

(True/False)
4.8/5
(37)

An activity in a network diagram cannot start until

(Multiple Choice)
4.8/5
(31)

In order to prevent poor quality and avoid quality problems, there needs to be

(Multiple Choice)
4.8/5
(35)

The responsibility assignment matrix shows

(Multiple Choice)
4.8/5
(32)

The project scope is all the work that must be done to do all of the following except:

(Multiple Choice)
4.7/5
(37)

The contractor or project team needs to gain agreement from ____ on the project scope document.

(Multiple Choice)
4.8/5
(38)

The inclusion of specifications or standards will help assure quality of the deliverable.

(True/False)
4.9/5
(32)

The ____ is a method used to display, in tabular format, the individuals responsible for accomplishing the work items in the WBS.

(Multiple Choice)
4.9/5
(42)

The project objective must be clear, attainable, specific, and measurable.

(True/False)
4.8/5
(33)

The project scope defines what needs to be done.

(True/False)
5.0/5
(37)

The lowest levels to include in a work breakdown structure

(Multiple Choice)
4.7/5
(40)

The key to quality control is to

(Multiple Choice)
4.8/5
(38)