Exam 8: Material Flow Analysis and Facility Layouts
Exam 1: Operations Management, Processes, and Supply Chain Management134 Questions
Exam 2: Corporate Strategy, Performance, and Sustainability133 Questions
Exam 3: Product Design and Development134 Questions
Exam 4: Process Design and Capacity Management134 Questions
Exam 5: Customer Relationships and Customer Service134 Questions
Exam 6: Demand Management, Forecasting, and Aggregate Planning133 Questions
Exam 7: Independent Demand Inventory Management133 Questions
Exam 8: Material Flow Analysis and Facility Layouts134 Questions
Exam 8: Supplement: Job Scheduling and Vehicle Routing55 Questions
Exam 9: Lean Systems128 Questions
Exam 10: Managing Customer and Work Flows133 Questions
Exam 11: Managing Information Flowsmrp and Erp134 Questions
Exam 12: Managing Projects133 Questions
Exam 13: Six Sigma Quality Management134 Questions
Exam 13: Supplement: Statistical Quality Control65 Questions
Exam 14: Global Supply Management133 Questions
Exam 15: Location, Logistics, and Product Returns134 Questions
Exam 16: Integrating Processes Along the Supply Chain134 Questions
Select questions type
Untreated bottlenecks can lead to all of the following except?
(Multiple Choice)
4.8/5
(42)
Transmission and receipt of a purchase order is which type of flow?
(Multiple Choice)
4.8/5
(40)
The scheduling of work releases to a system is referred to as the?
(Multiple Choice)
4.7/5
(40)
A restaurant has received numerous complaints about food being cold (cooked properly, but allowed to cool excessively) when delivered to customers' tables. How might the restaurant use material flow mapping and analysis to remedy this problem?
(Essay)
4.8/5
(36)
In an assembly line, the process of machine reprogramming, retooling, and inventory changes between production runs is referred to as a?
(Multiple Choice)
5.0/5
(32)
If an assembly line has an efficiency of 80% with 3 workcenters, how would removing a workcenter affect efficiency?
(Multiple Choice)
4.8/5
(33)
The closeness desirability rating is an office layout that should be?
(Multiple Choice)
4.9/5
(39)
Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 12, 15, and 10 minutes per unit, respectively. If the assembly line operates for 480 minutes per day with a desired output of 50 units per day, what is minimum number of workstations?
(Multiple Choice)
4.9/5
(39)
Material _______ mapping is used, in part, to improve understanding of the sequence of activities in a process.
(Short Answer)
4.8/5
(40)
Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 12, 15, and 10 minutes per unit, respectively. Which task is the bottleneck?
(Multiple Choice)
4.9/5
(35)
Which type of layout design is also referred to as an assembly line layout?
(Multiple Choice)
4.8/5
(39)
A measure of the closeness of departments that should be near each other is the?
(Multiple Choice)
4.8/5
(35)
What is the term for using end caps at the end of each aisle and making use of fixtures, lighting, and color to highlight products?
(Multiple Choice)
4.8/5
(38)
The use of computers in the manufacturing process is referred to as?
(Multiple Choice)
4.8/5
(47)
A rounded rectangle in a material flow map would best represent?
(Multiple Choice)
4.9/5