Exam 8: Material Flow Analysis and Facility Layouts

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Waiting for a product is which type of flow?

(Multiple Choice)
4.8/5
(37)

The TOC and DBR are decreasing in popularity.

(True/False)
4.8/5
(44)

The threshold area of a store is?

(Multiple Choice)
4.9/5
(41)

The Theory of Constraints is typically only applied in manufacturing settings.

(True/False)
4.8/5
(42)

In a material flow map, a delay is represented by a diamond.

(True/False)
4.9/5
(34)

What term is used to describe the environment in a retail setting?

(Multiple Choice)
4.7/5
(32)

Effective management of flows can drive improvements in all of the following areas except?

(Multiple Choice)
4.8/5
(28)

The completion of a purchase order is which type of flow?

(Multiple Choice)
4.8/5
(40)

Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 9, 9, and 11 minutes per unit, respectively. Which task is the bottleneck?

(Multiple Choice)
4.7/5
(26)

Using fixtures, lighting, and color to highlight products in a retail setting are examples of?

(Multiple Choice)
4.8/5
(35)

A heuristic solution approach to the assembly line balancing problem guarantees to find the best solution.

(True/False)
4.8/5
(46)

A ________ is a constraint that restricts material flow.

(Short Answer)
4.8/5
(42)

How are trends in layout design affecting retail and restaurant environments? Give at least one example from each environment.

(Essay)
4.9/5
(38)

Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 12, 15, and 10 minutes per unit, respectively. If the assembly line operates for 480 minutes per day with a desired output of 50 units per day, what is the takt time?

(Multiple Choice)
4.8/5
(41)

Collections of manufacturing workstations that are dedicated to the production of similar parts or part families are?

(Multiple Choice)
4.9/5
(37)

A house is an example of what type of layout?

(Multiple Choice)
4.9/5
(34)

A bottleneck results in reduced order lead time.

(True/False)
4.8/5
(31)

Dividing assembly tasks as equally as possible to each workcenter in an assembly line is referred to as?

(Multiple Choice)
4.9/5
(38)

Material flow analysis can help to answer all of the following questions except?

(Multiple Choice)
4.7/5
(40)

Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 9, 9, and 11 minutes per unit, respectively. If the assembly line operates for 400 minutes per day with a desired output of 70 units per day, what is the takt time?

(Multiple Choice)
5.0/5
(35)
Showing 101 - 120 of 134
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)