Exam 8: Material Flow Analysis and Facility Layouts
Exam 1: Operations Management, Processes, and Supply Chain Management134 Questions
Exam 2: Corporate Strategy, Performance, and Sustainability133 Questions
Exam 3: Product Design and Development134 Questions
Exam 4: Process Design and Capacity Management134 Questions
Exam 5: Customer Relationships and Customer Service134 Questions
Exam 6: Demand Management, Forecasting, and Aggregate Planning133 Questions
Exam 7: Independent Demand Inventory Management133 Questions
Exam 8: Material Flow Analysis and Facility Layouts134 Questions
Exam 8: Supplement: Job Scheduling and Vehicle Routing55 Questions
Exam 9: Lean Systems128 Questions
Exam 10: Managing Customer and Work Flows133 Questions
Exam 11: Managing Information Flowsmrp and Erp134 Questions
Exam 12: Managing Projects133 Questions
Exam 13: Six Sigma Quality Management134 Questions
Exam 13: Supplement: Statistical Quality Control65 Questions
Exam 14: Global Supply Management133 Questions
Exam 15: Location, Logistics, and Product Returns134 Questions
Exam 16: Integrating Processes Along the Supply Chain134 Questions
Select questions type
The Theory of Constraints is typically only applied in manufacturing settings.
(True/False)
4.8/5
(42)
What term is used to describe the environment in a retail setting?
(Multiple Choice)
4.7/5
(32)
Effective management of flows can drive improvements in all of the following areas except?
(Multiple Choice)
4.8/5
(28)
Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 9, 9, and 11 minutes per unit, respectively. Which task is the bottleneck?
(Multiple Choice)
4.7/5
(26)
Using fixtures, lighting, and color to highlight products in a retail setting are examples of?
(Multiple Choice)
4.8/5
(35)
A heuristic solution approach to the assembly line balancing problem guarantees to find the best solution.
(True/False)
4.8/5
(46)
How are trends in layout design affecting retail and restaurant environments? Give at least one example from each environment.
(Essay)
4.9/5
(38)
Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 12, 15, and 10 minutes per unit, respectively. If the assembly line operates for 480 minutes per day with a desired output of 50 units per day, what is the takt time?
(Multiple Choice)
4.8/5
(41)
Collections of manufacturing workstations that are dedicated to the production of similar parts or part families are?
(Multiple Choice)
4.9/5
(37)
Dividing assembly tasks as equally as possible to each workcenter in an assembly line is referred to as?
(Multiple Choice)
4.9/5
(38)
Material flow analysis can help to answer all of the following questions except?
(Multiple Choice)
4.7/5
(40)
Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 9, 9, and 11 minutes per unit, respectively. If the assembly line operates for 400 minutes per day with a desired output of 70 units per day, what is the takt time?
(Multiple Choice)
5.0/5
(35)
Showing 101 - 120 of 134
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)