Product-focused layouts are designed to achieve?

(Multiple Choice)
4.8/5
(32)

Assembly line efficiency is calculated by which of the following?

(Multiple Choice)
4.9/5
(32)

Machines that are programmable and able to complete repetitive steps in a manufacturing process are?

(Multiple Choice)
4.7/5
(32)

In a material flow map, a triangle represents?

(Multiple Choice)
4.9/5
(42)

The bottleneck process governs the processing rate of the entire system.

(True/False)
4.9/5
(42)

There are relatively limited flows within an organization.

(True/False)
4.7/5
(32)

Inventory held downstream of the bottleneck process is represents which of the following?

(Multiple Choice)
4.9/5
(35)

Assume that an assembly line has three tasks that must be completed (in order, A, B, C, and D). The tasks have processing times of 8, 12, 9, and 10 minutes per unit, respectively. If the assembly line operates for 500 minutes per day with a desired output of 50 units per day, what is the takt time?

(Multiple Choice)
4.9/5
(36)

The bottleneck process represents which of the following?

(Multiple Choice)
4.7/5
(40)

In a material flow map, a rectangle represents?

(Multiple Choice)
4.8/5
(42)

In a material flow map, a rounded rectangle represents?

(Multiple Choice)
4.8/5
(35)

A solid line in a material flow map would best represent?

(Multiple Choice)
4.9/5
(40)

A focus of material flow in a process-focused layout should be on?

(Multiple Choice)
4.8/5
(33)

A rectangle in a material flow map would best represent?

(Multiple Choice)
4.9/5
(42)

In an organization, something that keeps the firm from achieving its goals is referred to as a?

(Multiple Choice)
4.9/5
(38)

Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 12, 15, and 10 minutes per unit, respectively. If the assembly line operates for 480 minutes per day with a desired output of 50 units per day, what is assembly line efficiency?

(Multiple Choice)
4.8/5
(44)

A project layout often involves frequent movement of the product during its assembly.

(True/False)
4.8/5
(30)

A __________ layout is used for products that remain stationary during their assembly/construction.

(Short Answer)
4.7/5
(34)

Constraints can be overcome by all of the following except?

(Multiple Choice)
4.7/5
(30)

In a material flow map, a dashed arrow represents?

(Multiple Choice)
4.8/5
(37)