Exam 8: Material Flow Analysis and Facility Layouts

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

It is desirable to have decreased manufacturing flexibility.

(True/False)
4.9/5
(38)

The management/elimination of non-value-adding activities is a part of material flow mapping.

(True/False)
4.8/5
(46)

Jobs in a process-focused layout tend to be moved around a facility by?

(Multiple Choice)
4.8/5
(39)

Evaluating a process for effectiveness, quality, and productivity is referred to as?

(Multiple Choice)
4.7/5
(40)

Explain why it is desirable for a firm to have manufacturing flexibility. Give at least one example (from the textbook or elsewhere) of a firm relying on its flexibility.

(Essay)
4.9/5
(36)

Describe why a firm might wish to map its material flows? Identify potential benefits that could come from doing so.

(Essay)
4.8/5
(35)

Identifying and improving constrained processes is the focus of the?

(Multiple Choice)
4.7/5
(38)

If an assembly line has a target takt time of 10 minutes per unit (due to capacity constraints), how many units per day can be produced? Assume that a production day is 480 minutes.

(Multiple Choice)
4.8/5
(37)

Procedure and behavioral constraints include all of the following except?

(Multiple Choice)
4.8/5
(34)

Physical constraints include all of the following except?

(Multiple Choice)
4.8/5
(35)

CAM, in the context of manufacturing flexibility, refers to?

(Multiple Choice)
5.0/5
(36)

The design of a product using standardized parts while incorporating a degree of customized assembly prior to delivery to customers is referred to as?

(Multiple Choice)
4.9/5
(30)

Dividing assembly tasks as equally as possible to each workcenter in an assembly line is referred to as __________.

(Essay)
4.8/5
(39)

The use of fixtures, lighting, and color on retail end caps is a concept known as ________.

(Short Answer)
4.9/5
(38)

CNC, in the context of manufacturing flexibility, refers to?

(Multiple Choice)
4.8/5
(37)

Assume that an assembly line has three tasks that must be completed (in order, A, B, and C). The tasks have processing times of 7, 17, and 6 minutes per unit, respectively. What is the sum of task times?

(Multiple Choice)
4.7/5
(36)

Non-value-adding elements in a flow should be?

(Multiple Choice)
4.9/5
(26)

Which of the following is a common mass customization practice?

(Multiple Choice)
4.8/5
(23)

A process-focused layout is likely to lead to lower WIP inventories.

(True/False)
4.8/5
(36)

All of the following are terms for material flow mapping except?

(Multiple Choice)
4.8/5
(26)
Showing 61 - 80 of 134
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)