The last step in DBR production scheduling is to?

(Multiple Choice)
4.8/5
(36)

If an assembly line has an efficiency of 80% with 3 workcenters, how would adding a fourth workcenter affect assembly line efficiency?

(Multiple Choice)
4.8/5
(36)

In a material flow map, a solid arrow represents?

(Multiple Choice)
4.8/5
(39)

Assume that an assembly line has four tasks that must be completed (in order, A, B, C, and D). The tasks have processing times of 8, 12, 9, and 10 minutes per unit, respectively. Which task is the bottleneck?

(Multiple Choice)
4.9/5
(38)

Manufacturing flexibility refers to all of the following except?

(Multiple Choice)
4.8/5
(43)

A good process-focused layout should seek to?

(Multiple Choice)
4.8/5
(34)

A part of a process where a product is being worked on would be represented by a rectangle in a material flow map.

(True/False)
4.9/5
(39)

_________ refers to the evaluation of a process for effectiveness, quality, and productivity.

(Short Answer)
4.9/5
(38)

Material flow mapping involves all of the following except?

(Multiple Choice)
4.9/5
(27)

Process-focused layouts tend to sacrifice all of the following except?

(Multiple Choice)
4.9/5
(47)

If a bottleneck process has a processing rate of 20 units per hour, what is the processing rate of the system?

(Multiple Choice)
4.9/5
(26)

All of the following are strategies that can be employed in a retail layout except?

(Multiple Choice)
4.8/5
(37)

Takt time is calculated by which of the following?

(Multiple Choice)
4.7/5
(31)

A product-focused layout would be mostly closely identified with?

(Multiple Choice)
4.9/5
(38)

Assume that an assembly line has three tasks that must be completed (in order, A, B, C, and D). The tasks have processing times of 8, 12, 9, and 10 minutes per unit, respectively. If the assembly line operates for 500 minutes per day with a desired output of 50 units per day, what is the efficiency of the assembly line?

(Multiple Choice)
4.8/5
(41)

FMS, in the context of manufacturing flexibility, refers to?

(Multiple Choice)
4.8/5
(34)

Assembly line balancing is beneficial for all of the following reasons except?

(Multiple Choice)
4.9/5
(47)

Focal points in a center aisle location in a retail setting are referred to as?

(Multiple Choice)
4.8/5
(24)

The use of computer graphics applications in the product design process is referred to as?

(Multiple Choice)
4.8/5
(30)

Which type of layout design is used to achieve high volume output of standardized products?

(Multiple Choice)
4.8/5
(36)