Exam 14: Material Requirements Planning and Enterprise Resource Planning
Exam 1: Introduction to Operations Management63 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity54 Questions
Exam 3: Demand Forecasting172 Questions
Exam 4: A: Product Design74 Questions
Exam 4: B: Product Design56 Questions
Exam 5: A: Strategic Capacity Planning74 Questions
Exam 5: B: Strategic Capacity Planning64 Questions
Exam 6: A: Process Design and Facility Layout157 Questions
Exam 6: B: Process Design and Facility Layout99 Questions
Exam 7: A: Design of Work Systems143 Questions
Exam 7: B: Design of Work Systems68 Questions
Exam 8: A: Location Planning and Analysis74 Questions
Exam 8: B: Location Planning and Analysis16 Questions
Exam 9: Management of Quality98 Questions
Exam 10: A: Statistical Quality Control121 Questions
Exam 10: B: Statistical Quality Control61 Questions
Exam 11: Supply Chain Management86 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Operations Planning71 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning84 Questions
Exam 15: A: Just-In-Time and Lean Production82 Questions
Exam 15: B: Just-In-Time and Lean Production32 Questions
Exam 16: Job and Staff Scheduling112 Questions
Exam 17: Project Management127 Questions
Exam 18: A: Waiting-Line Analysis76 Questions
Exam 18: B: Waiting-Line Analysis41 Questions
Select questions type
Gross requirements for components are equal to the gross requirements of their immediate parent multiplied by the quantity per parent.
(True/False)
4.9/5
(45)
Develop a material requirements plan for end item P and its components, given the tree below. Assume that all lead times are one week, and that lot-for-lot ordering is used except for item F, which is ordered in multiples of 400 units.
One hundred units of P are needed at the start of each of weeks 4 and 8.
Beginning inventories are: 20 P, 100 A, and 200 F.
Scheduled receipts are: 800 F at the start of week 1.


(Essay)
4.8/5
(40)
For relatively stable situations,a net-change MRP is better suited than using regenerative MRP.
(True/False)
4.7/5
(37)
The emergence of ERP systems was primarily because they are less complex to use than MRP systems.
(True/False)
4.9/5
(38)
If 17 Ps are needed,and on-hand inventory consists of 10 As,15 Bs,20 Cs,12 Ms and 5 Ns,how many Cs are needed?
(Multiple Choice)
4.8/5
(36)
For a given component in an MRP plan,under lot-for-lot ordering,planned order sizes are equal to net requirements.
(True/False)
4.7/5
(41)
A net-change MRP is one that involves periodically updating all aspects of an MRP system.
(True/False)
4.9/5
(34)
Fixed-interval ordering in MRP places orders that cover a predetermined number of periods.
(True/False)
4.8/5
(46)
Which of these products and services would be most likely to have dependent demand?
(Multiple Choice)
4.7/5
(38)
MRP requires information on inventory on hand,open orders and lead times and purchase orders for each item in stock.
(True/False)
4.9/5
(49)
Load reports show capacity requirements for departments or work centres.
(True/False)
4.8/5
(32)
Which of the following are primary reports provided by MRP systems?
I.Planned order releases
II.Immediate order releases
III.Demand history reports
IV.Changes to open orders
(Multiple Choice)
4.9/5
(40)
For which period will the second order be submitted using the part period lot sizing method?
(Multiple Choice)
4.9/5
(33)
The three basic inputs of MRP are:
1)the bill of material; 2)inventory on hand,open orders and lead times; and 3)planned order releases.
(True/False)
4.8/5
(35)
The term pegging refers to identifying the parent items that have generated a given set of requirements for a part or subassembly.
(True/False)
4.9/5
(35)
Given the following data,construct a material requirements plan which will result in 100 units of Parent #1 (P1)at the beginning of week 6,and 200 units of Parent #2 (P2)at the beginning of week 8:


(Essay)
4.9/5
(36)
If 17 Ps are needed,and no on-hand inventory exists,how many Cs will be needed?
(Multiple Choice)
4.9/5
(34)
The planning horizon for the master production schedule (MPS)should cover or be longer than the cumulative lead time necessary to produce the end items.
(True/False)
4.9/5
(40)