Exam 14: Material Requirements Planning and Enterprise Resource Planning
Exam 1: Introduction to Operations Management63 Questions
Exam 2: Competitiveness, Strategic Planning, and Productivity54 Questions
Exam 3: Demand Forecasting172 Questions
Exam 4: A: Product Design74 Questions
Exam 4: B: Product Design56 Questions
Exam 5: A: Strategic Capacity Planning74 Questions
Exam 5: B: Strategic Capacity Planning64 Questions
Exam 6: A: Process Design and Facility Layout157 Questions
Exam 6: B: Process Design and Facility Layout99 Questions
Exam 7: A: Design of Work Systems143 Questions
Exam 7: B: Design of Work Systems68 Questions
Exam 8: A: Location Planning and Analysis74 Questions
Exam 8: B: Location Planning and Analysis16 Questions
Exam 9: Management of Quality98 Questions
Exam 10: A: Statistical Quality Control121 Questions
Exam 10: B: Statistical Quality Control61 Questions
Exam 11: Supply Chain Management86 Questions
Exam 12: Inventory Management168 Questions
Exam 13: Aggregate Operations Planning71 Questions
Exam 14: Material Requirements Planning and Enterprise Resource Planning84 Questions
Exam 15: A: Just-In-Time and Lean Production82 Questions
Exam 15: B: Just-In-Time and Lean Production32 Questions
Exam 16: Job and Staff Scheduling112 Questions
Exam 17: Project Management127 Questions
Exam 18: A: Waiting-Line Analysis76 Questions
Exam 18: B: Waiting-Line Analysis41 Questions
Select questions type
ERP packages are intended to fit established ways of doing business,but some modifications to business processes or the ERP software are typically required.
(True/False)
4.8/5
(34)
What is the lot size for the second order using the part-period method?
(Multiple Choice)
4.9/5
(35)
Which of the following are accurate statements concerning MPS,MRP and capacity requirements planning (CRP)?
I.CRP is equivalent to a master production schedule (MPS).
II.CRP is needed to determine if an MPS is feasible.
III.CRP is an input to MRP.
IV.Planned-order releases from MRP are the inputs for CRP.
(Multiple Choice)
4.9/5
(41)
A bill of material contains a listing of all the raw materials,parts,and subassemblies needed to produce one unit of an end item.
(True/False)
4.9/5
(39)
A process designed to handle purchasing and scheduling the production of dependent-demand components is:
(Multiple Choice)
4.7/5
(36)
Independent demand tends to be more sporadic or "lumpy" than dependent demand.
(True/False)
4.7/5
(40)
ERP systems are based on software modules for various functional areas of a business such as purchasing,production planning,and supply chain management.
(True/False)
4.8/5
(41)
MRP II is simply a label for current,more advanced versions of software applications for MRP.
(True/False)
4.7/5
(38)
In MRP processing the difference between a planned-order release and the planned-order receipt is:
(Multiple Choice)
4.9/5
(35)
Ignoring the possibility of safety stock requirements,which one of the following most closely describes the calculation of net requirements for an item in MRP?
(Multiple Choice)
4.8/5
(44)
What is the correct sequence to go from the broadest to the most detailed form of operations planning?
(Multiple Choice)
4.9/5
(35)
Which one of the following is not an input in an MRP system?
(Multiple Choice)
4.7/5
(35)
Under fixed-interval lot sizing,order sizes for component parts are determined based on which one of the following?
(Multiple Choice)
4.9/5
(43)
A master production schedule (MPS)is the principal output developed from MRP systems.
(True/False)
4.9/5
(38)
The master production schedule (MPS)states which product components are to be produced.
(True/False)
4.9/5
(29)
The MRP approach that immediately updates only those records directly affected by a change is referred to as a(n):
(Multiple Choice)
4.8/5
(37)
In MRP,under lot-for-lot ordering,the size of "planned-order receipts" are equal to:
(Multiple Choice)
4.9/5
(47)
Showing 61 - 80 of 84
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)