The final step in the project control process for measuring and evaluating project performance is to

(Multiple Choice)
4.8/5
(43)

The ________ rule assumes credit is earned for having performed the work once it is completed.This rule is usually used for work packages having very short durations.

(Short Answer)
4.9/5
(37)

A negative CV indicates the project is ________ budget.

(Short Answer)
4.7/5
(35)

The ratio that measures the amount of value each remaining dollar in the budget must earn to stay within the budget is the _________.

(Short Answer)
4.8/5
(42)

A tool used to monitor past project schedule performance and current performance, and to estimate future schedule trends is a simple line chart known as a

(Multiple Choice)
4.9/5
(36)

A negative VAC indicates that the project will be completed over budget.

(True/False)
4.7/5
(30)

Baseline costs typically include labor, equipment, materials and direct overhead cost.

(True/False)
4.9/5
(45)

Identify the steps in creating a control process that measures and evaluates project performance.

(Essay)
5.0/5
(38)

Given a BAC of 5,500 and an EAC of 6,000, the project is expected to be completed _________ budget.

(Short Answer)
4.8/5
(31)

The project network schedule is derived from the _______ and it serves as the baseline to compare against actual performance.

(Short Answer)
4.8/5
(37)

An undesirable schedule variance always indicates that the project is running behind schedule.

(True/False)
4.7/5
(21)

The value that tells you the planned value of work that has actually been completed is the

(Multiple Choice)
4.9/5
(29)

A "rubber baseline" occurs when, in an effort to disguise poor performance, the baseline changes to constantly match results.

(True/False)
4.8/5
(26)

In reviewing the budget report of a project, you notice that spending on the project is running about 10 percent over plan.Is the project in trouble? Why or why not?

(Essay)
4.9/5
(30)

What is a "rubber baseline" and how does it undermine project control?

(Essay)
4.8/5
(29)

A project manager learns that the project is only earning $.90 of planned work for each dollar spent by looking at the

(Multiple Choice)
4.8/5
(34)

The third step in the project control process for measuring and evaluating project performance is to

(Multiple Choice)
4.8/5
(35)

Jessica just received the following information on her project: PV = 200, EV = 300, AC = 250, BAC = 1500, EAC = 1208.In terms of cost at completion.

(Multiple Choice)
4.9/5
(34)

Progress and performance can be measured quantitatively as well as qualitatively.

(True/False)
4.7/5
(33)

All scope changes that result in increased costs should be avoided.

(True/False)
4.9/5
(31)
Showing 21 - 40 of 101