Exam 14: Operations Scheduling and Sequencing

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

For a single processor, a first-come, first-served (FCFS) rule minimizes the average flow time because customer waiting time will be minimized.

(True/False)
4.7/5
(28)

The time needed to process a given set of jobs is called

(Multiple Choice)
4.8/5
(31)

Short-term capacity fluctuations necessitate changes in schedules.List at least five factors affecting short-term capacity.

(Essay)
4.9/5
(45)

Describe Johnson's sequencing rule for the two-resource sequencing problem.

(Essay)
4.9/5
(34)

Scheduling problems occur almost exclusively in manufacturing.

(True/False)
4.8/5
(39)

Compare and contrast the advantages and disadvantages of the Shortest Processing Time (SPT) and the Earliest Due Date (EDD) sequencing rules.

(Essay)
4.9/5
(31)

The sequencing rule that minimizes the maximum number of jobs that are past due from a given set of jobs is

(Multiple Choice)
4.8/5
(37)

ScheduleAnywhere.com on-line software helps clients do all the following except

(Multiple Choice)
4.9/5
(32)

Scheduling and sequencing methods used in manufacturing are more beneficial in low-contact, than high-contact, service processes.

(True/False)
4.9/5
(26)

In sequencing jobs in a flow shop with two resources, Johnson's rule finds a sequence that has the smallest makespan.

(True/False)
4.8/5
(39)

Give at least five examples of service organizations (and employee type) where, due to high variability in customer demand, staff scheduling problems are prevalent.

(Essay)
4.8/5
(39)

A young entrepreneur has just opened an electronics store.One of the many tasks that she must address is work scheduling.She plans to stay open from 9a.m.to 9 p.m.Monday through Saturday.She expects her employees to stock the shelves and also be available for cashier check-out when needed.All employees are full time and work four days in a row with two consecutive days off each week.She estimates the number of employees needed each day as follows: A young entrepreneur has just opened an electronics store.One of the many tasks that she must address is work scheduling.She plans to stay open from 9a.m.to 9 p.m.Monday through Saturday.She expects her employees to stock the shelves and also be available for cashier check-out when needed.All employees are full time and work four days in a row with two consecutive days off each week.She estimates the number of employees needed each day as follows:     a.Use the days-off scheduling procedure to determine the minimum number of employees required? b.Based on your schedule found in part (a), which days are overstaffed and by how many workers are they overstaffed? a.Use the days-off scheduling procedure to determine the minimum number of employees required? b.Based on your schedule found in part (a), which days are overstaffed and by how many workers are they overstaffed?

(Essay)
5.0/5
(28)

UPS, the world's largest package delivery company, is highly dependent on scheduling but not sequencing.

(True/False)
4.8/5
(35)

Staff scheduling needs all of the following except

(Multiple Choice)
4.9/5
(39)

When several products share common facilities, product sequencing affects cost.

(True/False)
4.8/5
(28)

Which of the following is an example of a situation for which a Gantt chart would be appropriate?

(Multiple Choice)
4.8/5
(44)

Triage by nurses in an emergency room would be an example of

(Multiple Choice)
4.7/5
(32)

In sequencing a set of jobs on a single processor, different sequences will have different makespans but the same average flow times.

(True/False)
4.9/5
(33)

The chief disadvantage of the shortest processing time rule is:

(Multiple Choice)
4.7/5
(36)

Differentiate between scheduling and sequencing.

(Essay)
4.9/5
(36)
Showing 21 - 40 of 66
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)