Exam 16: Lean Systems
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
Which of the following is not a principle for reducing setup times?
(Multiple Choice)
4.8/5
(39)
Push systems rely on predetermined production schedules often generated by computerized systems.
(True/False)
4.9/5
(36)
Which of the following is not typically a component of lead time?
(Multiple Choice)
4.7/5
(45)
Which of the following statements concerning small-lot production is not true?
(Multiple Choice)
4.9/5
(34)
The time required for a worker to complete one pass through the operations assigned to her is called the operator cycle time.
(True/False)
4.8/5
(44)
A kanban square is a marked area designated for holding a set quantity of output.
(True/False)
4.7/5
(37)
One benefit of small lot production is that workers show fewer tendencies to let poor quality pass.
(True/False)
4.8/5
(30)
The authority given to the worker to stop the production line if quality problems are encountered is known as
(Multiple Choice)
4.9/5
(26)
The authority for a worker to stop the production line when quality problems are encountered is known as poka-yoke.
(True/False)
4.8/5
(38)
In lean production,a strong relationship exists between setup times and small lots.
(True/False)
5.0/5
(26)
The concept of allocating extra time to a schedule for planning,problem solving,and maintenance is known as
(Multiple Choice)
4.8/5
(32)
The lower inventory levels resulting from small-lot production hides problems in the production process.
(True/False)
4.9/5
(35)
Improved scheduling of materials,workers,and machines will most generally affect
(Multiple Choice)
4.9/5
(34)
The pace at which production should take place to match the rate of customer demand is known as
(Multiple Choice)
4.9/5
(31)