Exam 16: Lean Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is not a principle for reducing setup times?

(Multiple Choice)
4.8/5
(39)

Push systems rely on predetermined production schedules often generated by computerized systems.

(True/False)
4.9/5
(36)

In lean production,waste is defined as

(Multiple Choice)
4.8/5
(38)

Mixed-model sequencing

(Multiple Choice)
4.9/5
(25)

Which of the following is not typically a component of lead time?

(Multiple Choice)
4.7/5
(45)

Which of the following statements concerning small-lot production is not true?

(Multiple Choice)
4.9/5
(34)

The time required for a worker to complete one pass through the operations assigned to her is called the operator cycle time.

(True/False)
4.8/5
(44)

In a pull system reducing the number of kanbans

(Multiple Choice)
4.9/5
(38)

General purpose machines are an example of flexible resources.

(True/False)
4.8/5
(39)

A kanban square is a marked area designated for holding a set quantity of output.

(True/False)
4.7/5
(37)

One benefit of small lot production is that workers show fewer tendencies to let poor quality pass.

(True/False)
4.8/5
(30)

What role does the elimination of waste play in lean production?

(Essay)
4.9/5
(42)

The authority given to the worker to stop the production line if quality problems are encountered is known as

(Multiple Choice)
4.9/5
(26)

A push system prevents both overproduction and underproduction.

(True/False)
4.8/5
(32)

The authority for a worker to stop the production line when quality problems are encountered is known as poka-yoke.

(True/False)
4.8/5
(38)

In lean production,a strong relationship exists between setup times and small lots.

(True/False)
5.0/5
(26)

The concept of allocating extra time to a schedule for planning,problem solving,and maintenance is known as

(Multiple Choice)
4.8/5
(32)

The lower inventory levels resulting from small-lot production hides problems in the production process.

(True/False)
4.9/5
(35)

Improved scheduling of materials,workers,and machines will most generally affect

(Multiple Choice)
4.9/5
(34)

The pace at which production should take place to match the rate of customer demand is known as

(Multiple Choice)
4.9/5
(31)
Showing 21 - 40 of 79
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)