Exam 16: Lean Systems
Exam 1: Operations Management63 Questions
Exam 2: Quality Management71 Questions
Exam 3: Statistical Quality Control111 Questions
Exam 4: Product Design75 Questions
Exam 5: Service Design79 Questions
Exam 6: Processes and Technology61 Questions
Exam 17: Scheduling80 Questions
Exam 7: Capacity and Facilities83 Questions
Exam 8: Human Resources79 Questions
Exam 9: Project Management85 Questions
Exam 10: Supply Chain Management: Strategy and Design56 Questions
Exam 11: Global Supply Chain Procurement and Distribution69 Questions
Exam 12: Forecasting85 Questions
Exam 13: Inventory Management78 Questions
Exam 13: Operational Decision-Making Tools: Simulation22 Questions
Exam 14: Operational Decision-Making Tools: Linear Programming29 Questions
Exam 14: The Sales and Operations Planning Process76 Questions
Exam 15: Resource Planning82 Questions
Exam 16: Lean Systems79 Questions
Exam 18: Operational Decision-Making Tools: Decision Analysis38 Questions
Exam 19: Operational Decision-Making Tools: Acceptance Sampling28 Questions
Exam 20: Decision-Making Tools: Facility Location Models23 Questions
Exam 21: Operational Decision-Making Tools: Work Measurement31 Questions
Select questions type
To keep machines running firms can use either breakdown maintenance or preventative maintenance.
(True/False)
4.9/5
(43)
The individual generally credited with the development of lean production is an American.
(True/False)
4.9/5
(28)
Waiting for parts to arrive or for machines to finish production is considered a form of waste under the principles of mass production.
(True/False)
4.9/5
(30)
In the dual kanban system,a withdrawal kanban authorizes the production of goods.
(True/False)
4.8/5
(32)
All of the following factors pressure companies for quicker response and shorter cycle times except
(Multiple Choice)
4.9/5
(43)
Mixed-modeling sequencing is used at Toyota to reduce setup times.
(True/False)
4.8/5
(40)
Combining the practice of preventive maintenance with the concepts of total quality is known as
(Multiple Choice)
4.9/5
(39)
Which of the following is not a typical component of lead time?
(Multiple Choice)
5.0/5
(40)
In a pull production system a card that corresponds to a standard quantity of production is known as a(n)
(Multiple Choice)
4.8/5
(37)
One component of lead time,setup time,is often the biggest bottle neck.
(True/False)
4.9/5
(38)
Kanbans are used to maintain the discipline required of a push production system.
(True/False)
4.7/5
(37)
A poka-yoke is any foolproof device that prevents defects or injury from occurring.
(True/False)
4.8/5
(31)
A ___________ is a foolproof device that prevents defects from occurring.
(Multiple Choice)
5.0/5
(36)
A ____________ kanban is used to order material in advance of production.
(Multiple Choice)
4.8/5
(40)
Mass production means doing more with fewer workers,less inventory,and less space.
(True/False)
4.7/5
(36)
Showing 41 - 60 of 79
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)