Exam 10: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Four hundred and eighty minutes of production time are available per day.Scheduled production is 120 units per day.What is the required cycle time?

(Multiple Choice)
4.9/5
(36)

A product-oriented layout would be MOST appropriate for which one of the following businesses?

(Multiple Choice)
4.8/5
(37)

The ________ layout's main objective is to equalize the task time for each station.

(Multiple Choice)
4.8/5
(33)

Which of the following is NOT an advantage of work cells?

(Multiple Choice)
4.9/5
(31)

The disadvantages of process-oriented layout come from:

(Multiple Choice)
4.8/5
(38)

________ is the pace (frequency)of production necessary (time per unit)to meet customer orders.

(Short Answer)
4.8/5
(33)

To develop a good facility layout,what must be determined?

(Essay)
4.9/5
(41)

An assembly line consists of 21 tasks grouped into 5 workstations.The sum of the 21 task times is 85 minutes.The largest assigned cycle time is 20 minutes.What is the efficiency of this line?

(Multiple Choice)
4.9/5
(48)

Which of the following is NOT an information requirement for solving a load-distance problem to design a process layout?

(Multiple Choice)
4.7/5
(36)

Mathematically,takt time is:

(Multiple Choice)
4.9/5
(34)

A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below. A firm operates a flow shop building kitchen cabinetry for recreational vehicles.The major activities of this process are listed below.    a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d? a.Draw the appropriate network for this project. b.What would the cycle time be if the goal is to produce 20 units per month (the plant operates 160 hours per month)? c.What is the theoretical minimum number of workstations needed? d.Balance with the most following tasks heuristic.What tasks are assigned to which stations? e.What is the efficiency of the line obtained in part d?

(Essay)
4.9/5
(37)

Which of the following is NOT one of the factors complicating the techniques for addressing the fixed-position layout?

(Multiple Choice)
4.9/5
(38)

________ avoids placing materials or supplies in storage by processing them as they are received for shipment.

(Short Answer)
4.8/5
(32)

An assembly line has been designed to make battery-powered beverage mixers.Task details are shown in the table below: An assembly line has been designed to make battery-powered beverage mixers.Task details are shown in the table below:    a.What is the assigned cycle time (in minutes)? b.What is the maximum output rate of this line in mixers per hour? c.What is the total idle time per cycle? d.What is the assembly line's efficiency? a.What is the assigned cycle time (in minutes)? b.What is the maximum output rate of this line in mixers per hour? c.What is the total idle time per cycle? d.What is the assembly line's efficiency?

(Essay)
4.8/5
(29)

Slotting fees:

(Multiple Choice)
4.8/5
(31)

Four hundred and eighty minutes of production time are available per day.The schedule calls for the production of 80 units per day.Each unit of the product requires 30 minutes of work.What is the theoretical minimum number of workstations?

(Multiple Choice)
4.7/5
(41)

An assembly line consists of 158 tasks grouped into 32 workstations.The sum of all task times is 105 minutes.The largest assigned cycle time is 4 minutes.What is the efficiency of this line?

(Multiple Choice)
4.9/5
(37)

Servicescape refers to the physical surrounding in which the service is delivered.

(True/False)
4.9/5
(48)

One guideline for determining the arrangement and space allocation of a retail store is to place high-impulse and high-margin items in prominent locations.

(True/False)
4.9/5
(35)

An assembly line is assigned as follows.Station 1- task A,B,and C.Station 2- task D.Station 3- task E and F.The task times are 7,3,2,9,4,and 5 minutes respective to A,B,C,D,E,and F.(Assume that there is no precedence relationships between the tasks,i.e.they can be performed in any order) (a)Calculate the efficiency. (b)What would the assignment of tasks to stations be using the shortest processing time heuristic (assuming the current maximum station time remains the cycle time)?

(Essay)
4.9/5
(36)
Showing 41 - 60 of 146
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)