Exam 10: Layout Strategies
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment119 Questions
Exam 3: Project Management120 Questions
Exam 4: Forecasting141 Questions
Exam 5: Design of Goods and Services118 Questions
Exam 6: Managing Quality123 Questions
Exam 7: Process Strategy108 Questions
Exam 8: Capacity and Constraint Management96 Questions
Exam 9: Location Strategies120 Questions
Exam 10: Layout Strategies146 Questions
Exam 11: Human Resources, job Design, and Work Measurement154 Questions
Exam 12: Supply Chain Management144 Questions
Exam 13: Inventory Management163 Questions
Exam 14: Aggregate Planning and Sop116 Questions
Exam 15: Material Requirements Planning Mrpand Erp113 Questions
Exam 16: Short-Term Scheduling116 Questions
Exam 17: Jit, tps, and Lean Operations115 Questions
Exam 18: Maintenance and Reliability111 Questions
Exam 19: Sustainability in the Supply Chain80 Questions
Exam 20: Statistical Process Control144 Questions
Exam 21: Supply Chain Management Analytics55 Questions
Exam 22: Decision-Making Tools97 Questions
Exam 23: Linear Programming80 Questions
Exam 24: Transportation Models89 Questions
Exam 25: Waiting-Line Models119 Questions
Exam 26: Learning Curves105 Questions
Exam 27: Simulation75 Questions
Select questions type
The most common tactic followed in process-layout planning is to arrange departments or work centers so they:
(Multiple Choice)
4.9/5
(34)
A company is trying to balance production between 3 workstations on an assembly line.Currently there are 5 tasks that need to be performed.These tasks,ABCDE,have required times of 2 minutes,4 minutes,1 minutes,3 minutes,and 10 minutes,respectively.The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day.
(a)What is the required cycle time?
(b)What is the theoretical minimum # of workstations?
(c)Assign the tasks according to the shortest task time heuristic.
(Essay)
4.9/5
(38)
What is a servicescape? How is it related to the retail layout problem? What are the three elements of servicescape for dealing with these human issues?
(Essay)
4.8/5
(34)
Which of the statements below best describes office layout?
(Multiple Choice)
4.9/5
(43)
What layout strategy deals with low-volume,high-variety production?
(Multiple Choice)
4.8/5
(49)
A(n)________ line is a machine-paced product-oriented facility for building components.
(Short Answer)
4.7/5
(42)
For which of the following operations would a fixed-position layout be MOST appropriate?
(Multiple Choice)
4.9/5
(42)
A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.These assemblies require five operations.Standard times for these operations are: Operation A,3.0 minutes,B,1.8 minutes,C,2.4 minutes,D,2.5 minutes,and E,1.4 minutes.
(a)What is takt time for this cell?
(b)How many workers will be needed to achieve this schedule?
(Essay)
4.8/5
(34)
A work cell is scheduled to build 120 digital light processor (DLP)assemblies each week.These assemblies are later installed into home theater projection systems.The work cell has 7.5 hours of productive work each day,six days per week.What is takt time for this cell?
(Essay)
4.9/5
(39)
Identify the formulas for the following terms that occur in assembly line balancing: (1)cycle time,(2)minimum number of workstations,and (3)efficiency.
(Essay)
5.0/5
(34)
Which of the following reduces product handling,inventory,and facility costs,but requires both (1)tight scheduling and (2)accurate inbound product information?
(Multiple Choice)
4.8/5
(34)
Category management is the use of computer software to evaluate the profitability of various merchandising plans for hundreds of categories.
(True/False)
4.9/5
(36)
Which of the following does NOT support the retail layout objective of maximizing customer exposure to products?
(Multiple Choice)
4.8/5
(36)
A work cell is required to make 200 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.What is takt time for this cell?
(Essay)
4.9/5
(45)
"A special arrangement of machinery and equipment to focus on production of a single product or group of related products" describes what layout type?
(Multiple Choice)
4.9/5
(30)
What is the primary reason why retailers tend to locate high-draw items around the periphery of the store?
(Multiple Choice)
4.8/5
(32)
Because problems with fixed-position layouts are so difficult to solve well onsite,operations managers:
(Multiple Choice)
4.9/5
(37)
Which of the following is NOT a heuristic rule for assigning tasks to workstations in a product layout?
(Multiple Choice)
5.0/5
(41)
Showing 21 - 40 of 146
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)