Exam 10: Layout Strategies

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Identify the four requirements for cellular production.

(Essay)
4.8/5
(49)

The most common tactic followed in process-layout planning is to arrange departments or work centers so they:

(Multiple Choice)
4.9/5
(34)

A company is trying to balance production between 3 workstations on an assembly line.Currently there are 5 tasks that need to be performed.These tasks,ABCDE,have required times of 2 minutes,4 minutes,1 minutes,3 minutes,and 10 minutes,respectively.The assembly line needs to produce 40 units per day to meet demand and can work for up to 8 hours each day. (a)What is the required cycle time? (b)What is the theoretical minimum # of workstations? (c)Assign the tasks according to the shortest task time heuristic.

(Essay)
4.9/5
(38)

What is a servicescape? How is it related to the retail layout problem? What are the three elements of servicescape for dealing with these human issues?

(Essay)
4.8/5
(34)

Which of the statements below best describes office layout?

(Multiple Choice)
4.9/5
(43)

What layout strategy deals with low-volume,high-variety production?

(Multiple Choice)
4.8/5
(49)

A(n)________ line is a machine-paced product-oriented facility for building components.

(Short Answer)
4.7/5
(42)

For which of the following operations would a fixed-position layout be MOST appropriate?

(Multiple Choice)
4.9/5
(42)

A work cell is required to make 140 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.These assemblies require five operations.Standard times for these operations are: Operation A,3.0 minutes,B,1.8 minutes,C,2.4 minutes,D,2.5 minutes,and E,1.4 minutes. (a)What is takt time for this cell? (b)How many workers will be needed to achieve this schedule?

(Essay)
4.8/5
(34)

A work cell is scheduled to build 120 digital light processor (DLP)assemblies each week.These assemblies are later installed into home theater projection systems.The work cell has 7.5 hours of productive work each day,six days per week.What is takt time for this cell?

(Essay)
4.9/5
(39)

Identify the formulas for the following terms that occur in assembly line balancing: (1)cycle time,(2)minimum number of workstations,and (3)efficiency.

(Essay)
5.0/5
(34)

Which of the following reduces product handling,inventory,and facility costs,but requires both (1)tight scheduling and (2)accurate inbound product information?

(Multiple Choice)
4.8/5
(34)

Category management is the use of computer software to evaluate the profitability of various merchandising plans for hundreds of categories.

(True/False)
4.9/5
(36)

Which of the following does NOT support the retail layout objective of maximizing customer exposure to products?

(Multiple Choice)
4.8/5
(36)

A work cell is required to make 200 computerized diagnostic assemblies (for installation into hybrid automobiles)each day.The cell currently works an eight hour shift,of which seven hours is available for productive work.What is takt time for this cell?

(Essay)
4.9/5
(45)

"A special arrangement of machinery and equipment to focus on production of a single product or group of related products" describes what layout type?

(Multiple Choice)
4.9/5
(30)

Identify McDonald's seven major innovations.

(Essay)
4.8/5
(34)

What is the primary reason why retailers tend to locate high-draw items around the periphery of the store?

(Multiple Choice)
4.8/5
(32)

Because problems with fixed-position layouts are so difficult to solve well onsite,operations managers:

(Multiple Choice)
4.9/5
(37)

Which of the following is NOT a heuristic rule for assigning tasks to workstations in a product layout?

(Multiple Choice)
5.0/5
(41)
Showing 21 - 40 of 146