Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of Lead time for cakes is 2 days with daily demand of 10 cakes and a safety stock of   a day.Each container (kanban)holds 1 cake.What is the correct number of kanbans? a day.Each container (kanban)holds 1 cake.What is the correct number of kanbans?

(Multiple Choice)
4.9/5
(31)

Which one of the following is an example of JIT being used for competitive advantage?

(Multiple Choice)
4.8/5
(34)

Which one of the following is a concern expressed by suppliers?

(Multiple Choice)
4.8/5
(32)

________ is the Japanese word for card that has come to mean "signal."

(Essay)
4.8/5
(32)

Waste is anything that does not add value,such as storage or inspection of items;waste also includes any activity that does not add value from the consumer's perspective.

(True/False)
4.9/5
(29)

The word "kanban" means

(Multiple Choice)
4.8/5
(34)

Which of the following is not a goal of JIT partnerships?

(Multiple Choice)
4.7/5
(35)

JIT systems carry inventory just in case something goes wrong.

(True/False)
4.9/5
(38)

The number of kanbans should be equal to

(Multiple Choice)
5.0/5
(37)

Which one of the following is not a benefit of the implementation of JIT?

(Multiple Choice)
4.9/5
(38)

Which one of the following is not a layout tactic in a JIT environment?

(Multiple Choice)
4.9/5
(31)

A push system means providing the next station with exactly what is needed when it is needed.

(True/False)
4.9/5
(39)

Excess bags of basic commodities such as flour and sugar that are stored in a restaurant's kitchen represent which of the following wastes?

(Multiple Choice)
4.9/5
(32)

A scheduler may find that freezing the portion of the schedule closest to the due dates allows the production system to function and the schedule to be met.

(True/False)
4.9/5
(41)

Explain how JIT works in services.After all,how does "small lot size" and "reduce setup cost" make sense in services? Supply examples to support your work.

(Essay)
4.8/5
(37)

A manufacturer took the following actions to reduce inventory.Which of these is generally not accepted as a JIT action?

(Multiple Choice)
4.8/5
(44)

Lean operations are known for their

(Multiple Choice)
4.9/5
(29)

JIT suppliers have concerns that the JIT firm's demands for small lot sizes are simply a way of transferring holding cost from manufacturer firm to the supplier firm.

(True/False)
4.9/5
(32)

In a JIT system,product inspection adds value by identifying defective items.

(True/False)
4.8/5
(37)

Concerning relationships with suppliers,which of the following combinations is critical to the success of JIT?

(Multiple Choice)
4.8/5
(38)