Exam 16: Jit and Lean Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which one of the following statements is true regarding JIT inventory?

(Multiple Choice)
4.9/5
(30)

Variability in manufacturing can occur because engineering drawings or specifications are incomplete or inaccurate.

(True/False)
4.9/5
(40)

A kanban system requires little variability in lead time because shortages have their impact on the entire productive system.

(True/False)
4.7/5
(36)

The ________ is the time between the arrival of raw materials and the shipping of finished products.

(Essay)
4.9/5
(39)

Product storage is an example of waste,in the sense that no value is added.

(True/False)
5.0/5
(32)

Lead time for computers is 5 days with daily demand of 25 and safety stock of 5 computers.If management wants to use 10 kanbans how many computers should each one hold?

(Multiple Choice)
4.9/5
(33)

Define manufacturing cycle time in the context of JIT systems.

(Essay)
4.8/5
(26)

A certain product has been effectively managed in the past,according to its managers.The previous technique used the economic production quantity model,and resulted in an optimum lot size of 100.For this product,setup time is directly proportional to setup cost,and setup time is currently 40 minutes per batch.How much must setup time decline in order for the lot size to fall to 50 units? 25 units? 10 units?

(Essay)
5.0/5
(41)

Which one of the following is not a requirement of JIT systems?

(Multiple Choice)
4.9/5
(34)

Level scheduling means producing at a constant rate,regardless of customer demands.

(True/False)
4.9/5
(31)

TPS stands for ________.

(Short Answer)
4.7/5
(30)

Identify JIT scheduling tactics.

(Essay)
4.9/5
(35)

With level schedules,a few large batches,rather than frequent small batches,are processed.

(True/False)
4.9/5
(34)

One goal of JIT partnerships is the removal of in-plant inventory by delivery in small lots directly to the using department as needed.

(True/False)
4.8/5
(30)

The Toyota Production System requires that activities have built-in,automatic tests so that gaps between expectations and actuality are immediately evident.

(True/False)
4.8/5
(34)

In JIT partnerships,suppliers have several concerns.Which of the following is not such a concern?

(Multiple Choice)
4.7/5
(33)

Weekly usage of a product is 8 units.Since the plant operates 50 weeks per year,this leads to annual usage of 400 units.Setup cost is $40 and annualized carrying cost is $80.Weekly production of this product is 12 units.Lead time is four weeks,and safety stock is one week's production.What is optimal kanban size? What is the optimal number of kanbans?

(Essay)
4.9/5
(31)

The 5Ss-sort/segregate,simplify/straighten,shine/sweep,standardize,and sustain/self discipline-are important to lean production because they act as a means to reduce waste.

(True/False)
4.8/5
(37)

When suppliers are encouraged to locate near manufacturing plants,the goal of the JIT partnership is to reduce ________ inventory.

(Essay)
4.7/5
(32)

Cross-training is a common JIT tactic to improve flexibility.

(True/False)
4.8/5
(42)
Showing 61 - 80 of 138
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)