Exam 16: Jit and Lean Operations
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management122 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 20: Outsourcing As a Supply-Chain Strategy73 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand Erp169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
Which one of the following statements is true regarding JIT inventory?
(Multiple Choice)
4.9/5
(30)
Variability in manufacturing can occur because engineering drawings or specifications are incomplete or inaccurate.
(True/False)
4.9/5
(40)
A kanban system requires little variability in lead time because shortages have their impact on the entire productive system.
(True/False)
4.7/5
(36)
The ________ is the time between the arrival of raw materials and the shipping of finished products.
(Essay)
4.9/5
(39)
Product storage is an example of waste,in the sense that no value is added.
(True/False)
5.0/5
(32)
Lead time for computers is 5 days with daily demand of 25 and safety stock of 5 computers.If management wants to use 10 kanbans how many computers should each one hold?
(Multiple Choice)
4.9/5
(33)
A certain product has been effectively managed in the past,according to its managers.The previous technique used the economic production quantity model,and resulted in an optimum lot size of 100.For this product,setup time is directly proportional to setup cost,and setup time is currently 40 minutes per batch.How much must setup time decline in order for the lot size to fall to 50 units? 25 units? 10 units?
(Essay)
5.0/5
(41)
Which one of the following is not a requirement of JIT systems?
(Multiple Choice)
4.9/5
(34)
Level scheduling means producing at a constant rate,regardless of customer demands.
(True/False)
4.9/5
(31)
With level schedules,a few large batches,rather than frequent small batches,are processed.
(True/False)
4.9/5
(34)
One goal of JIT partnerships is the removal of in-plant inventory by delivery in small lots directly to the using department as needed.
(True/False)
4.8/5
(30)
The Toyota Production System requires that activities have built-in,automatic tests so that gaps between expectations and actuality are immediately evident.
(True/False)
4.8/5
(34)
In JIT partnerships,suppliers have several concerns.Which of the following is not such a concern?
(Multiple Choice)
4.7/5
(33)
Weekly usage of a product is 8 units.Since the plant operates 50 weeks per year,this leads to annual usage of 400 units.Setup cost is $40 and annualized carrying cost is $80.Weekly production of this product is 12 units.Lead time is four weeks,and safety stock is one week's production.What is optimal kanban size? What is the optimal number of kanbans?
(Essay)
4.9/5
(31)
The 5Ss-sort/segregate,simplify/straighten,shine/sweep,standardize,and sustain/self discipline-are important to lean production because they act as a means to reduce waste.
(True/False)
4.8/5
(37)
When suppliers are encouraged to locate near manufacturing plants,the goal of the JIT partnership is to reduce ________ inventory.
(Essay)
4.7/5
(32)
Showing 61 - 80 of 138