Exam 16: Jit and Lean Operations
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management122 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 20: Outsourcing As a Supply-Chain Strategy73 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand Erp169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
A firm wants to develop a level material use schedule based on the following data.What should be the setup cost? 

(Multiple Choice)
4.7/5
(33)
A repetitive manufacturing firm is planning on level material use.The following information has been collected.Currently,the firm operates 250 days per year.
a.What is the setup cost,based on the desired lot size?
b.What is the setup time,based on $40 per hour setup labor?

(Essay)
4.8/5
(36)
A product has annual demand of 100,000 units.The plant manager wants production to follow a four-hour cycle.Based on the following data,what setup cost will enable the desired production cycle? d = 400 per day (250 days per year),p = 4000 units per day,H = $40 per unit per year,and Q = 200 (demand for four hours,half a day).
(Multiple Choice)
4.8/5
(36)
JIT brings about competitive advantage by faster response to the customer regardless of cost.
(True/False)
4.9/5
(41)
The main focus of JIT efforts to reduce investment in inventory requires ________.
(Essay)
4.9/5
(36)
Reduction of in-transit inventory can be encouraged through use of
(Multiple Choice)
4.8/5
(35)
A grocery store is attempting to implement a kanban system.Which of the following would not be an application of kanbans?
(Multiple Choice)
4.8/5
(37)
________ gets suppliers to accept responsibility for satisfying end customer needs.
(Essay)
4.8/5
(34)
Inventory has only one positive aspect,which is availability;inventory has several negatives,including increased material handling,obsolescence,and damage.
(True/False)
4.9/5
(29)
A bakery uses 6 containers that each hold 4 cakes.If safety stock is 2 cakes and lead time is 11 days,determine daily demand.
(Essay)
4.7/5
(35)
Customer demand will always remain an unknown,so it is not considered a source of variation.
(True/False)
4.9/5
(41)
Identify Ohno's Seven Wastes.Which one of these deals most directly with distance reductions?
(Essay)
4.7/5
(40)
________ involves scheduling products so that each day's production meets the demand for that day.
(Essay)
4.9/5
(28)
What are the 5Ss? Why does the list of the 5Ss sometimes have seven elements?
(Essay)
4.7/5
(42)
Which of the following is an illustration of employee empowerment?
(Multiple Choice)
4.8/5
(34)
Characteristics of just-in-time partnerships do not include
(Multiple Choice)
4.9/5
(37)
Showing 41 - 60 of 138
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)