A firm wants to develop a level material use schedule based on the following data.What should be the setup cost? A firm wants to develop a level material use schedule based on the following data.What should be the setup cost?

(Multiple Choice)
4.7/5
(33)

What three things does the Toyota Production System (TPS)emphasize?

(Essay)
4.8/5
(30)

A repetitive manufacturing firm is planning on level material use.The following information has been collected.Currently,the firm operates 250 days per year. A repetitive manufacturing firm is planning on level material use.The following information has been collected.Currently,the firm operates 250 days per year.    a.What is the setup cost,based on the desired lot size? b.What is the setup time,based on $40 per hour setup labor? a.What is the setup cost,based on the desired lot size? b.What is the setup time,based on $40 per hour setup labor?

(Essay)
4.8/5
(36)

A product has annual demand of 100,000 units.The plant manager wants production to follow a four-hour cycle.Based on the following data,what setup cost will enable the desired production cycle? d = 400 per day (250 days per year),p = 4000 units per day,H = $40 per unit per year,and Q = 200 (demand for four hours,half a day).

(Multiple Choice)
4.8/5
(36)

JIT brings about competitive advantage by faster response to the customer regardless of cost.

(True/False)
4.9/5
(41)

The main focus of JIT efforts to reduce investment in inventory requires ________.

(Essay)
4.9/5
(36)

Reduction of in-transit inventory can be encouraged through use of

(Multiple Choice)
4.8/5
(35)

Reducing distance is a common JIT goal.

(True/False)
4.9/5
(36)

A grocery store is attempting to implement a kanban system.Which of the following would not be an application of kanbans?

(Multiple Choice)
4.8/5
(37)

________ gets suppliers to accept responsibility for satisfying end customer needs.

(Essay)
4.8/5
(34)

Inventory has only one positive aspect,which is availability;inventory has several negatives,including increased material handling,obsolescence,and damage.

(True/False)
4.9/5
(29)

A bakery uses 6 containers that each hold 4 cakes.If safety stock is 2 cakes and lead time is 11 days,determine daily demand.

(Essay)
4.7/5
(35)

TPS stands for Total Production Streamlining.

(True/False)
4.9/5
(29)

Customer demand will always remain an unknown,so it is not considered a source of variation.

(True/False)
4.9/5
(41)

Identify Ohno's Seven Wastes.Which one of these deals most directly with distance reductions?

(Essay)
4.7/5
(40)

________ involves scheduling products so that each day's production meets the demand for that day.

(Essay)
4.9/5
(28)

What are the 5Ss? Why does the list of the 5Ss sometimes have seven elements?

(Essay)
4.7/5
(42)

Which of the following is an illustration of employee empowerment?

(Multiple Choice)
4.8/5
(34)

Characteristics of just-in-time partnerships do not include

(Multiple Choice)
4.9/5
(37)

The number of kanbans decreases as safety stock is increased.