Exam 18: Statistical Process Control
Exam 1: Operations and Productivity126 Questions
Exam 2: Operations Strategy in a Global Environment135 Questions
Exam 3: Project Management122 Questions
Exam 4: Forecasting144 Questions
Exam 5: Design of Goods and Services137 Questions
Exam 6: Managing Quality130 Questions
Exam 18: Statistical Process Control156 Questions
Exam 7: Process Strategy and Sustainability131 Questions
Exam 19: Capacity and Constraint Management107 Questions
Exam 8: Location Strategies140 Questions
Exam 9: Layout Strategies161 Questions
Exam 10: Human Resources,job Design,and Work Measurement192 Questions
Exam 11: Supply-Chain Management145 Questions
Exam 20: Outsourcing As a Supply-Chain Strategy73 Questions
Exam 12: Inventory Management171 Questions
Exam 13: Aggregate Planning134 Questions
Exam 14: Material Requirements Planning Mrpand Erp169 Questions
Exam 15: Short-Term Scheduling139 Questions
Exam 16: Jit and Lean Operations138 Questions
Exam 17: Maintenance and Reliability130 Questions
Exam 21: Decision-Making Tools97 Questions
Exam 22: Linear Programming100 Questions
Exam 23: Transportation Models94 Questions
Exam 24: Waiting-Line Models135 Questions
Exam 25: Learning Curves111 Questions
Exam 26: Simulation92 Questions
Select questions type
The number of late insurance claim payouts per 100 should be measured with a(n)
(Multiple Choice)
4.7/5
(37)
An acceptance sampling plan is to be designed to meet the organization's targets for product quality and risk levels.Which of the following is true?
(Multiple Choice)
4.9/5
(34)
Red Top Cab Company receives multiple complaints per day about driver behavior.Over 9 days the owner recorded the number of calls to be 3,0,8,9,6,7,4,9,8.What is the upper control limit for the c-chart?
(Multiple Choice)
4.9/5
(37)
If a sample of items is taken and the mean of the sample is outside the control limits the process is
(Multiple Choice)
4.8/5
(40)
The purpose of an x-bar chart is to determine whether there has been a
(Multiple Choice)
4.9/5
(34)
The ________ is a quality control chart used to control the number of defects per unit of output.
(Essay)
4.8/5
(37)
A retail store manager is trying to improve and control the rate at which cashiers sign customers up
for store credit cards.After posting a p-chart of the store's credit card sign-ups the manager takes
new samples of size 50 three weeks later.He finds that each sample of 50 contained 5 credit card
signups on average.Find p-bar and 99.73% control limits.
(Essay)
4.9/5
(44)
The width of a bronze bar is intended to be one-eighth of an inch (0.125 inches).Inspection samples contain five bars each.The average range of these samples is 0.01 inches.What are the upper and lower control limits for the x-bar and R-chart for this process,using 3-sigma limits?
(Essay)
4.8/5
(28)
To set
-chart upper and lower control limits,one must know the process central line,which is the

(Multiple Choice)
4.9/5
(28)
The
index measures the difference between desired and actual dimensions of goods or services produced.

(True/False)
5.0/5
(34)
Which of the following statements on acceptance sampling is true?
(Multiple Choice)
4.8/5
(41)
An acceptance sampling plan must define "good lots" and "bad lots" and specify the risk level associated with each one.
(True/False)
4.9/5
(33)
A manager wishes to build a 3-sigma range chart for a process.The sample size is five,the mean of sample means is 16.01,and the average range is 5.3.From Table S6.1,the appropriate value of
is 0,and
is 2.115.The UCL and LCL for this range chart are


(Multiple Choice)
4.8/5
(44)
Which of the following is true regarding the average outgoing quality level?
(Multiple Choice)
4.9/5
(36)
In statistical process control,the range often substitutes for the standard deviation.
(True/False)
4.8/5
(38)
Showing 81 - 100 of 156
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)