Exam 18: Statistical Process Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The number of late insurance claim payouts per 100 should be measured with a(n)

(Multiple Choice)
4.7/5
(37)

An acceptance sampling plan is to be designed to meet the organization's targets for product quality and risk levels.Which of the following is true?

(Multiple Choice)
4.9/5
(34)

Consumer's risk is the probability of

(Multiple Choice)
4.7/5
(35)

What is the purpose of the Operating Characteristics curve?

(Essay)
4.8/5
(39)

Red Top Cab Company receives multiple complaints per day about driver behavior.Over 9 days the owner recorded the number of calls to be 3,0,8,9,6,7,4,9,8.What is the upper control limit for the c-chart?

(Multiple Choice)
4.9/5
(37)

If a sample of items is taken and the mean of the sample is outside the control limits the process is

(Multiple Choice)
4.8/5
(40)

The purpose of an x-bar chart is to determine whether there has been a

(Multiple Choice)
4.9/5
(34)

The ________ is a quality control chart used to control the number of defects per unit of output.

(Essay)
4.8/5
(37)

A retail store manager is trying to improve and control the rate at which cashiers sign customers up for store credit cards.After posting a p-chart of the store's credit card sign-ups the manager takes new samples of size 50 three weeks later.He finds that each sample of 50 contained 5 credit card signups on average.Find p-bar and 99.73% control limits.

(Essay)
4.9/5
(44)

X-bar charts are used when we are sampling attributes.

(True/False)
4.8/5
(39)

The width of a bronze bar is intended to be one-eighth of an inch (0.125 inches).Inspection samples contain five bars each.The average range of these samples is 0.01 inches.What are the upper and lower control limits for the x-bar and R-chart for this process,using 3-sigma limits?

(Essay)
4.8/5
(28)

To set To set   -chart upper and lower control limits,one must know the process central line,which is the -chart upper and lower control limits,one must know the process central line,which is the

(Multiple Choice)
4.9/5
(28)

The The   index measures the difference between desired and actual dimensions of goods or services produced. index measures the difference between desired and actual dimensions of goods or services produced.

(True/False)
5.0/5
(34)

What is the AOQ of an acceptance sampling plan?

(Essay)
4.8/5
(35)

Which of the following statements on acceptance sampling is true?

(Multiple Choice)
4.8/5
(41)

An acceptance sampling plan must define "good lots" and "bad lots" and specify the risk level associated with each one.

(True/False)
4.9/5
(33)

The p-chart tells us whether there has been a

(Multiple Choice)
4.7/5
(38)

A manager wishes to build a 3-sigma range chart for a process.The sample size is five,the mean of sample means is 16.01,and the average range is 5.3.From Table S6.1,the appropriate value of A manager wishes to build a 3-sigma range chart for a process.The sample size is five,the mean of sample means is 16.01,and the average range is 5.3.From Table S6.1,the appropriate value of   is 0,and   is 2.115.The UCL and LCL for this range chart are is 0,and A manager wishes to build a 3-sigma range chart for a process.The sample size is five,the mean of sample means is 16.01,and the average range is 5.3.From Table S6.1,the appropriate value of   is 0,and   is 2.115.The UCL and LCL for this range chart are is 2.115.The UCL and LCL for this range chart are

(Multiple Choice)
4.8/5
(44)

Which of the following is true regarding the average outgoing quality level?

(Multiple Choice)
4.9/5
(36)

In statistical process control,the range often substitutes for the standard deviation.

(True/False)
4.8/5
(38)
Showing 81 - 100 of 156