________ are planning charts used to schedule resources and allocate time.

(Essay)
4.7/5
(41)

A work center had actual input of 280 hours and actual output of 270 hours.What is the change in backlog?

(Multiple Choice)
4.7/5
(41)

Which of the following is an aid used to monitor jobs in progress?

(Multiple Choice)
4.8/5
(33)

Which critical ratio value implies that a job is already late?

(Multiple Choice)
4.8/5
(32)

________ cards are used to control the amount of work in a work center,aiding input-output control.

(Essay)
4.8/5
(34)

Which of the following dispatching rules tends to minimize job flow time?

(Multiple Choice)
4.9/5
(36)

________ determine the sequence of jobs in process-oriented facilities.

(Essay)
4.8/5
(42)

Use Johnson's rule to determine the optimal sequencing for the five jobs to be processed on two machines in a fixed order (Machine 1 before Machine 2).The processing times in hours are given in the table below. a.What is the optimal sequence? b.What is the total flow time for this sequence? Use Johnson's rule to determine the optimal sequencing for the five jobs to be processed on two machines in a fixed order (Machine 1 before Machine 2).The processing times in hours are given in the table below. a.What is the optimal sequence? b.What is the total flow time for this sequence?

(Essay)
4.9/5
(37)

The correct sequence from longest to smallest duration scheduling is:

(Multiple Choice)
4.8/5
(37)

At Morgan's Transformer Rebuilding,a set of five jobs is ready for dispatching to a machine center.The processing times and due dates for the jobs are given in the table below.Use shortest processing time to sequence the jobs,and calculate the average completion time,the average job lateness,and the average number of jobs in the machine center. At Morgan's Transformer Rebuilding,a set of five jobs is ready for dispatching to a machine center.The processing times and due dates for the jobs are given in the table below.Use shortest processing time to sequence the jobs,and calculate the average completion time,the average job lateness,and the average number of jobs in the machine center.

(Essay)
4.8/5
(36)

The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client.Accordingly,she has estimated the time it should take for each of her top consultants-Charlie,Gerald,Johnny,and Rick-to complete any of the four projects,as follows: The president of a consulting firm wants to minimize the total number of hours it will take to complete four projects for a new client.Accordingly,she has estimated the time it should take for each of her top consultants-Charlie,Gerald,Johnny,and Rick-to complete any of the four projects,as follows:    (a)What is the total number of hours required by the following arbitrary assignment? Charlie→B;Gerald→A;Johnny→D;Rick→C (b)What is the optimal assignment of consultants to projects? (Use the assignment method. ) (c)For the optimal schedule,what is the total number of hours it will take these consultants to complete these projects? (a)What is the total number of hours required by the following arbitrary assignment? Charlie→B;Gerald→A;Johnny→D;Rick→C (b)What is the optimal assignment of consultants to projects? (Use the assignment method. ) (c)For the optimal schedule,what is the total number of hours it will take these consultants to complete these projects?

(Essay)
4.9/5
(38)

A manufacturer has the following jobs waiting on a single work center.The firm has not decided which dispatching rule to apply in order to prioritize the jobs and fix them into the schedule.Processing time in 15-minute time blocks and due date for each job are in the table below. A manufacturer has the following jobs waiting on a single work center.The firm has not decided which dispatching rule to apply in order to prioritize the jobs and fix them into the schedule.Processing time in 15-minute time blocks and due date for each job are in the table below.    a.Complete the following table.Show your supporting calculations below. b.Which dispatching rule has the best score for flow time? for work in process (jobs in the system)? for lateness? c.Is there ANY sequence that can avoid all lateness? Explain or provide an example.   a.Complete the following table.Show your supporting calculations below. b.Which dispatching rule has the best score for flow time? for work in process (jobs in the system)? for lateness? c.Is there ANY sequence that can avoid all lateness? Explain or provide an example. A manufacturer has the following jobs waiting on a single work center.The firm has not decided which dispatching rule to apply in order to prioritize the jobs and fix them into the schedule.Processing time in 15-minute time blocks and due date for each job are in the table below.    a.Complete the following table.Show your supporting calculations below. b.Which dispatching rule has the best score for flow time? for work in process (jobs in the system)? for lateness? c.Is there ANY sequence that can avoid all lateness? Explain or provide an example.

(Essay)
4.9/5
(39)

Delta uses mathematical short-term scheduling techniques and a high-tech nerve center to manage the rapid rescheduling necessary to cope with weather delays and similar disruptions.

(True/False)
4.8/5
(34)

Which of the following dispatching rules ordinarily gives the best results when the criterion is lowest time for completion of the full sequence of jobs?

(Multiple Choice)
4.8/5
(43)

Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the earliest due date dispatching rule,in which order should the jobs be processed? Five jobs are waiting to be processed.Their processing times and due dates are given below.Using the earliest due date dispatching rule,in which order should the jobs be processed?

(Multiple Choice)
4.9/5
(37)

What is the difference between a Gantt load chart and a Gantt scheduling chart?

(Essay)
4.8/5
(38)

The ________ is a special class of linear programming models that involves assigning tasks or jobs to resources.

(Essay)
4.9/5
(30)

Gantt charts are useful for scheduling jobs,but not for loading them.

(True/False)
4.8/5
(32)

The operations manager of a body and paint shop has five cars to schedule for repair.He would like to minimize the throughput time (makespan)to complete all work on these cars.Each car requires body work prior to painting.The estimates of the times required to do the body and paint work on each are as follows: The operations manager of a body and paint shop has five cars to schedule for repair.He would like to minimize the throughput time (makespan)to complete all work on these cars.Each car requires body work prior to painting.The estimates of the times required to do the body and paint work on each are as follows:    (a)Use Johnson's rule to sequence these five jobs for minimum total duration.Show your work in determining the job sequence. (b)The optimal sequence is ________. (c)Chart the progress of the five jobs in this optimal sequence. (d)After how many hours will all jobs be completed? (a)Use Johnson's rule to sequence these five jobs for minimum total duration.Show your work in determining the job sequence. (b)The optimal sequence is ________. (c)Chart the progress of the five jobs in this optimal sequence. (d)After how many hours will all jobs be completed?

(Essay)
4.9/5
(37)

Compare short-term scheduling at process-focused,repetitive,and product-focused facilities.

(Essay)
4.9/5
(47)