Exam 15: Scheduling for the Short-Term

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following is a limitation of rules-based dispatching systems?

(Multiple Choice)
4.9/5
(34)

Forward scheduling is the scheduling of:

(Multiple Choice)
4.8/5
(41)

When a set of jobs must pass through two workstations whose sequence is fixed,________ is the sequencing rule most commonly applied.

(Multiple Choice)
4.9/5
(28)

The priority rule that appears fair to customers in service systems is ________.

(Essay)
4.7/5
(34)

A recent advance in short-term scheduling that makes use of expert systems and simulation in solving dynamic scheduling problems is:

(Multiple Choice)
4.8/5
(49)

Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job D is split into two equivalently sized sections,D1 and D2,each with a body work time of 1.5 hours and a paint time of 2 hours (D1 and D2 sum to 3 hours of body work and 4 hours of paint which is equivalent to D).How much is makespan reduced by this splitting of D? Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job D is split into two equivalently sized sections,D1 and D2,each with a body work time of 1.5 hours and a paint time of 2 hours (D1 and D2 sum to 3 hours of body work and 4 hours of paint which is equivalent to D).How much is makespan reduced by this splitting of D?

(Essay)
4.9/5
(36)

Which of the following statements regarding scheduling at Delta Airlines is FALSE?

(Multiple Choice)
4.8/5
(42)

Which of the following is TRUE regarding services scheduling?

(Multiple Choice)
4.9/5
(37)

What does Johnson's rule do?

(Essay)
4.8/5
(37)

Finite capacity scheduling provides the user with graphical interactive computing,which is the technique's primary advantage over rule-based scheduling.

(True/False)
4.8/5
(37)

Which of the following is not an effectiveness criterion for scheduling?

(Multiple Choice)
4.9/5
(34)

Which of the following considers process capacity when scheduling?

(Multiple Choice)
4.8/5
(35)

What are four main criteria by which we evaluate sequencing rules?

(Essay)
4.9/5
(37)

EDD stands for what?

(Multiple Choice)
4.8/5
(38)

Consider the arrival of patients into a public health clinic.Some patients are ill;some are injured;some are elderly;and some are very young.Some cases may be life-threatening,while others are inconsequential.How do the basic dispatch rules fall short in this situation? Design a dispatch rule for scheduling these patients.

(Essay)
4.8/5
(34)

Process-focused facilities and repetitive facilities generate forward-looking schedules,but process-focused facilities do this with JIT and kanban while repetitive facilities generally use MRP.

(True/False)
4.9/5
(40)

What is finite capacity scheduling (FCS)?

(Essay)
4.7/5
(29)

In manufacturing scheduling,physical inventories of goods can buffer variations in demand,but service scheduling normally lacks that buffer because services are generally consumed at the same time they are delivered.

(True/False)
4.9/5
(45)

Average completion time for a schedule sequence at a work center is the ratio of:

(Multiple Choice)
4.9/5
(27)

With forward scheduling,jobs are scheduled as late as possible within the time allowed by the customer due dates.

(True/False)
4.9/5
(42)