Exam 15: Scheduling for the Short-Term
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
Which of the following is a limitation of rules-based dispatching systems?
(Multiple Choice)
4.9/5
(34)
When a set of jobs must pass through two workstations whose sequence is fixed,________ is the sequencing rule most commonly applied.
(Multiple Choice)
4.9/5
(28)
The priority rule that appears fair to customers in service systems is ________.
(Essay)
4.7/5
(34)
A recent advance in short-term scheduling that makes use of expert systems and simulation in solving dynamic scheduling problems is:
(Multiple Choice)
4.8/5
(49)
Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job D is split into two equivalently sized sections,D1 and D2,each with a body work time of 1.5 hours and a paint time of 2 hours (D1 and D2 sum to 3 hours of body work and 4 hours of paint which is equivalent to
D).How much is makespan reduced by this splitting of D?


(Essay)
4.9/5
(36)
Which of the following statements regarding scheduling at Delta Airlines is FALSE?
(Multiple Choice)
4.8/5
(42)
Which of the following is TRUE regarding services scheduling?
(Multiple Choice)
4.9/5
(37)
Finite capacity scheduling provides the user with graphical interactive computing,which is the technique's primary advantage over rule-based scheduling.
(True/False)
4.8/5
(37)
Which of the following is not an effectiveness criterion for scheduling?
(Multiple Choice)
4.9/5
(34)
Which of the following considers process capacity when scheduling?
(Multiple Choice)
4.8/5
(35)
Consider the arrival of patients into a public health clinic.Some patients are ill;some are injured;some are elderly;and some are very young.Some cases may be life-threatening,while others are inconsequential.How do the basic dispatch rules fall short in this situation? Design a dispatch rule for scheduling these patients.
(Essay)
4.8/5
(34)
Process-focused facilities and repetitive facilities generate forward-looking schedules,but process-focused facilities do this with JIT and kanban while repetitive facilities generally use MRP.
(True/False)
4.9/5
(40)
In manufacturing scheduling,physical inventories of goods can buffer variations in demand,but service scheduling normally lacks that buffer because services are generally consumed at the same time they are delivered.
(True/False)
4.9/5
(45)
Average completion time for a schedule sequence at a work center is the ratio of:
(Multiple Choice)
4.9/5
(27)
With forward scheduling,jobs are scheduled as late as possible within the time allowed by the customer due dates.
(True/False)
4.9/5
(42)