Exam 15: Scheduling for the Short-Term
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
The constant work-in-process (ConWIP)card aids input-output control by limiting the amount of work in a work center.
(True/False)
4.8/5
(35)
Using LPT priority would result in what sequence for Jobs A,B,C,and D if their process times are 4,6,5,and 2 respectively?
(Multiple Choice)
4.8/5
(39)
Lockport Marine Services,Inc.wishes to assign a set of jobs to a set of machines.The following table provides data on the cost of production of each job when performed on a specific machine.
(a)Determine the set of assignments that minimizes production cost.
(b)What is the total production cost of your assignments?


(Essay)
4.8/5
(40)
A firm that specializes in desktop publishing for local charities has agreed to take on the following jobs.The firm has not decided which dispatching rule to apply in order to prioritize the jobs and fix them into the schedule.All dates are specified as days from today.
a.Complete the following table.Show your supporting calculations below.
b.Which dispatching rule has the best score for flow time?
c.Which dispatching rule has the best score for work-in-process (jobs in the system)?
d.Which dispatching rule has the best score for lateness?



(Essay)
4.7/5
(40)
________ determines the order in which jobs should be done at each work center.
(Essay)
4.8/5
(40)
Jack's Refrigeration Repair is under contract to repair,recondition,and/or refurbish commercial and industrial icemakers from restaurants,seafood processors,and similar organizations.Jack currently has five jobs to be scheduled,shown in the order in which they arrived.
(a)Complete the following table.(Show your supporting calculations below).
(b)Which dispatching rule has the best score for flow time?
(c)Which dispatching rule has the best score for work-in-process (jobs in the system)?
(d)Which dispatching rule has the best score for lateness?



(Essay)
4.8/5
(36)
If an assignment problem consists of 5 workers and 4 projects:
(Multiple Choice)
4.7/5
(37)
Five welding jobs are waiting to be processed.Their processing times and due dates are given below.Using the critical ratio dispatching rule,in which order should the jobs be processed? All dates are specified as days from today. 

(Multiple Choice)
4.8/5
(31)
Earliest due date is a shop floor dispatching (sequencing)rule that relates the time available to complete a job to the amount of work left to be completed.
(True/False)
4.8/5
(28)
A Gantt load chart shows the loading and idle time of several departments,machines,or facilities.
(True/False)
4.8/5
(33)
The assignment method provides an optimum,one-to-one assignment of jobs to resources.
(True/False)
4.9/5
(43)
In retail outlets,customers are usually processed on a first come,first served basis.Why? Is the express lane in the supermarket an exception? Craft a sequencing rule to explain express lane behavior.
(Essay)
4.9/5
(35)
Explain,in your own words,how backward scheduling and forward scheduling differ.
(Essay)
4.9/5
(34)
Short-term scheduling is important to efficiency and to cost reduction,but its impact is not of strategic importance.
(True/False)
4.9/5
(32)
________ uses computerized short-term scheduling to overcome the disadvantages of rule-based systems by providing the user with interactive computing and graphical output.
(Essay)
4.9/5
(41)
If job 5 takes 3,4 or 5 hours to be completed by workers A,B,and C,respectively,what would the row values for job 5 be after performing Step 1A of the assignment method?
(Multiple Choice)
4.9/5
(38)
Orders are processed in the sequence in which they arrive if (the)________ rule sequences the jobs.
(Multiple Choice)
5.0/5
(39)
Given the following chart of jobs assigned with Johnson's rule,suppose that all the jobs (A,B,C,etc)could be evenly divided into two tasks (such as A1 and A2,B1 and B2,etc).Suppose job B is divided into jobs B1 and B2,each with a body work time of 4.5 hours and a paint time of 2 hours.How much is makespan reduced by this splitting of B? 

(Essay)
4.8/5
(39)
Machines A,B,C,and D have been in use for several years,while machine E is new.The following table provides data on the value of production of each job when performed on a specific machine.
(a)Determine the set of assignments that maximizes production value.
(b)What is the total production value of your assignments?
(c)Which machine should be retired (i.e. ,gets no assignment)?


(Essay)
4.9/5
(42)
Showing 61 - 80 of 116
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)