Exam 15: Scheduling for the Short-Term

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Identify the major disadvantages of the Gantt load chart.

(Essay)
4.7/5
(30)

The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the shortest processing time rule,what is the average completion time? The jobs listed below need to be completed.Assume that it is now day 140.If the jobs are sequenced according to the shortest processing time rule,what is the average completion time?

(Multiple Choice)
4.9/5
(39)

A practitioner of family medicine begins her day with five patients needing urgent care.She does a very brief assessment of what each patient appears to need and estimates the time required of each.None of the cases is life-threatening,and so she determines to take the five in the order that they arrived at the clinic.The processing-time data for these patients,in the order they arrived,are: Patient A,30 minutes;Patient B,40 minutes;Patient C,10 minutes;Patient D,50 minutes;and Patient E,15 minutes.(a)If it is now 8:00 a.m. ,at what time will the doctor be finished with all five of these emergencies?(b)How much time will the five patients have collectively spent waiting?(c)How much less time would have been spent waiting if the doctor had taken the patients according to shortest processing time?

(Essay)
4.9/5
(37)

Complete the table;find average lateness,average completion time,and average number of jobs in the system.Assume all durations are in days and that the jobs are processed at the shop in the order that they arrive (A then B then C then D). Complete the table;find average lateness,average completion time,and average number of jobs in the system.Assume all durations are in days and that the jobs are processed at the shop in the order that they arrive (A then B then C then D).

(Essay)
4.9/5
(40)

Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Sigma before work center Delta.According to Johnson's rule,what sequence of jobs will minimize the completion time for all jobs? Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Sigma before work center Delta.According to Johnson's rule,what sequence of jobs will minimize the completion time for all jobs?

(Multiple Choice)
4.9/5
(34)

What is the primary disadvantage of the shortest processing time dispatch rule? Is this a problem if there can be no new jobs arriving after the sequence is set?

(Essay)
4.7/5
(31)

The critical ratio sequencing rule prioritizes the jobs based on the importance or value of the customers who have placed the orders.

(True/False)
4.8/5
(33)

Dispatching rules are typically judged by four effectiveness criteria: average completion time,utilization,average number of jobs in the system,and average job lateness.

(True/False)
4.9/5
(32)

Which of the following is NOT tracked by scheduling optimization systems used in retail stores?

(Multiple Choice)
4.9/5
(38)

The benefits of effective scheduling include lower cost,faster throughput,and dependable delivery.

(True/False)
4.8/5
(37)

A work center had planned outputs of 10,15,13,and 20 hours with actual outputs of 12,14,13,and 18 hours.What is the cumulative deviation in output?

(Multiple Choice)
4.8/5
(52)

If an assignment problem consists of 6 workers and 7 projects:

(Multiple Choice)
4.8/5
(30)

Flow time represents the time:

(Multiple Choice)
4.8/5
(37)

In services,the scheduling emphasis is usually on staffing levels,not materials.

(True/False)
4.8/5
(43)

Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,which job should be scheduled first in the sequence? Five jobs are waiting for processing through two work centers.Their processing time (in minutes)at each work center is contained in the table below.Each job requires work center Alpha before work center Beta.According to Johnson's rule,which job should be scheduled first in the sequence?

(Multiple Choice)
4.8/5
(36)

A work center is interested in limiting work-in-process by not allowing production to start again until the current batch is finished.The best solution most likely involves:

(Multiple Choice)
4.8/5
(48)
Showing 101 - 116 of 116
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)