Exam 10: Job Design and Work Measurement
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
________ allowances are those that account for the distance from employees to restrooms,water fountains,and other facilities.
(Essay)
4.8/5
(32)
An initial analysis of a laboratory activity resulted in the first table below.After this analysis,the managers determined that their element descriptions were not as accurate as they should have been-they had left out an element,underestimated a distance,and understated the need for accuracy.They revised the table of element data,which appears in the second table.
Calculate the total standard minutes for the original activity "pouring tube specimen." Calculate the total standard minutes for the revised activity "pouring tube specimen." What is the increase,in seconds,from the first version to the second? (Round calculations to four decimal places. )


(Essay)
4.9/5
(32)
Profit-sharing is a motivation and incentive system where executives receive stock options.
(True/False)
4.7/5
(46)
Timing a sample of a worker's performance and using it as a basis for setting a standard time describes which of the following?
(Multiple Choice)
4.9/5
(37)
Working four shifts of ten hours each instead of five shifts of eight hours each is known as which of the following?
(Multiple Choice)
4.8/5
(32)
Flextime is a system that allows employees,within limits,to determine their own work schedules.
(True/False)
5.0/5
(35)
The allowance factor that increases normal time to standard time compensates for inadequate worker training and lack of worker dexterity.
(True/False)
4.9/5
(35)
Which of the following is not a limitation of job expansion?
(Multiple Choice)
4.7/5
(42)
Suppose that a time study analyst takes a sample of size 60 observations.The process mean is 100 seconds,and the standard deviation is 3 seconds.If the max error can be no more than ± 1 second,how confident can the analyst be in the results?
(Essay)
4.9/5
(35)
Describe how the visual workplace can increase information flow,improve efficiency,and eliminate non-value-adding activities.Support your argument with a few examples.
(Essay)
4.8/5
(39)
In a preliminary work sample of an operation,out of 50 observations the operator was observed idle in 5 observations.What sample size is required for a work sampling study if the desired confidence level is 99% and the desired accuracy level is ± 5%?
(Essay)
4.8/5
(32)
Management and labor share the labor cost reductions in which of these compensation schemes?
(Multiple Choice)
4.8/5
(42)
An advantage of work sampling is that it completely breaks down work elements.
(True/False)
4.8/5
(32)
The two most basic policies associated with employment stability are:
(Multiple Choice)
4.9/5
(29)
Showing 61 - 80 of 154
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)