Exam 10: Job Design and Work Measurement
Exam 1: Operations and Productivity127 Questions
Exam 2: The Global Environment and Operations Strategy119 Questions
Exam 3: Managing Projects120 Questions
Exam 4: Forecasting Demand140 Questions
Exam 5: Product Design118 Questions
Exam 6: Quality Management and International Standards123 Questions
Exam 7: Process Design108 Questions
Exam 8: Location Decisions121 Questions
Exam 9: Layout Decisions146 Questions
Exam 10: Job Design and Work Measurement154 Questions
Exam 11: Supply Chain Management145 Questions
Exam 12: Managing Inventory163 Questions
Exam 13: Aggregate Scheduling116 Questions
Exam 14: Material Requirements Planning Mrpand Erp113 Questions
Exam 15: Scheduling for the Short-Term116 Questions
Exam 16: Jit,lean Operations,and the Toyota Production System115 Questions
Exam 17: Maintenance and Reliability Decisions111 Questions
Exam 18: Sustainability80 Questions
Exam 19: Statistical Process Control144 Questions
Exam 20: Capacity Planning96 Questions
Exam 21: Supply Chain Modeling55 Questions
Exam 22: Decision Modeling97 Questions
Exam 23: Linear Programming Models88 Questions
Exam 24: Transportation Modeling89 Questions
Exam 25: Queuing Models119 Questions
Exam 26: Learning Curves110 Questions
Exam 27: Modeling with Simulation75 Questions
Select questions type
Labor standards based on historical experience are relatively inexpensive to obtain.
(True/False)
4.9/5
(39)
A therblig is a very small amount of time: one hundred-thousandth of an hour.
(True/False)
4.7/5
(35)
Work sampling estimates the percent of time that a worker spends on various tasks.
(True/False)
4.8/5
(44)
A manufacturing plant is trying to determine standard production per day for an incentive program.Suppose that the incentive program will pay $1 per unit produced above standard rates.A worker is timed at an average of 280 seconds per unit,with a performance rating of 105%.The plant has an allowance factor of 13%.If the worker later produces 100 units in an 8 hour shift,how much would he receive under the incentive plan?
(Essay)
4.9/5
(36)
________ are drawings used to analyze movement of people or material.
(Essay)
4.9/5
(33)
A work sampling study requires an acceptable error level of 10 percent and z = 2 for 95.45 percent confidence.The adequate sample size is ________ if the sample proportion is thought to be as large as 50 percent,but ________ if the sample proportion is thought to be about 20 percent.
(Multiple Choice)
4.8/5
(43)
Among the advantages of predetermined time standards are all EXCEPT which of the following?
(Multiple Choice)
4.8/5
(39)
Which of the following best describes mutual commitment in an organization?
(Multiple Choice)
4.8/5
(37)
A worker completed a task 10 times during a period in which a typical trained employee completes the task 8 times.What is the worker's performance rating?
(Multiple Choice)
4.7/5
(45)
________ refers to a work schedule that deviates from the normal or standard five 8-hour days.
(Essay)
4.9/5
(40)
A manager who is conducting a time study now needs an accuracy of ±0.1 minutes,rather than ±0.2 minutes as in the past.Because of this change in accuracy,the new required sample size becomes:
(Multiple Choice)
4.7/5
(34)
Explain in broad terms,using a sentence or two,what is meant by the "classical stopwatch study." To what extent is it still in use today?
(Essay)
4.9/5
(27)
In a time study,what is the required sample size to be 95% confident that the observed average time is within ± 2% of the actual value,if the process has a standard deviation of 1 minute and mean of 50 minutes?
(Essay)
4.9/5
(33)
The objective of a human resource strategy is to manage labor and design jobs so people are effectively and efficiently utilized.
(True/False)
4.8/5
(38)
Sample observations of a claims processor made over a 160-hour work month reveal that the worker produced a total of 384 completed claims forms.The performance rating was 80%.The worker was idle 20% of the time (so that idle time should be subtracted from the total time when computing the average observed time).The allowance factor is 8%.What is the normal time per unit?
(Multiple Choice)
4.8/5
(44)
A bank manager wants to determine the percent of time the bank's tellers are working and idle.He decides to use work sampling,and his initial estimate is that the tellers are idle 20% of the time.Approximately how many observations should be taken to be 95% confident that the results will not be more than 5% away from the true result?